Installation on site, in 25 notes.

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Articles
25
Newest
14 November 2026
Oldest
23 June 2026
  • Method statementsInstallation method statement for furniture runs to one page: access, sequence, fixings, protection and who signs off.
  • Site contactsSite contact protocol for a furniture delivery gives the crew a drawing, a sequence and a named person on site.
  • ProtectionProtecting finished work during a furniture install is mostly about the furniture itself: corner guards on every run, felt under every leg and cartons that stay on until the piece is in position.
  • Fixing heightsFixing heights come off the furniture drawing rather than off the wall.
  • Spares on siteSpare parts on site cover the failures that happen in year one: glides, a cover or two and a hardware set.
  • As-builtAs-built drawing records the dining area with the furniture in place, instead of the furniture on a drawing.
  • HandoverFurniture handover pack carries the assembly sequence, the fixing schedule and the touch-up colour references.
  • Snag listsInstallation snag list for furniture covers paint, covers, stitching, gaps at a joint and anything that rocks.
  • Opening datesOpening date planning works backwards through installation, shipping, production and sampling.
  • PhasingPhased installation is normal on a live site, and the cost is protection instead of labour.
  • WasteInstallation waste from a 60 seat dining area runs to about 8 cubic metres of cardboard and timber packing, and most of that is a design decision instead of a site habit.
  • Touch-upTouch-up on site covers chips in a coating, scuffs on a cover and marks on a timber edge.
  • Install timeBooth installation time runs to about an hour a row where the run arrives knocked down and bolted, and about twenty minutes where it arrives assembled and is fixed to the wall.
  • Crew sizeInstallation crew size follows the heaviest piece instead of the total.
  • EgressEgress with fixed seating is calculated on the clear width that remains once the run is in place. The seat count is a separate sum.
  • AnchoringWall anchoring for fixed seating uses fixings through the back into studs at 400 mm centres, or through the plinth into the floor.
  • Floor levelFloor level tolerance in an older building runs to 25 mm across 6 metres, and a run built true shows it as a gap under one end of the plinth.
  • SequenceBooth assembly sequence runs bases, tops, backs, then covers where the cover is a separate item.
  • ToolsFurniture assembly tools for a booth install run to a cordless driver with the correct bit, a rubber mallet, a level, a tape, a knife and the hex keys matched to the hardware.
  • Floor protectionFloor protection during installation belongs to whoever is on site.
  • StairsStair carry limits the length of any piece that goes upstairs, and the number comes from the geometry instead of from strength.
  • LiftsLift size decides what goes upstairs in one piece.
  • Door widthsDoor width for furniture sets the largest single piece that can enter the dining area, and 900 mm clear is the working number.
  • Route checkDelivery route check follows the path from the vehicle to the dining floor with the largest packed piece in mind.
  • Site surveySteakhouse furniture site survey records five numbers: the wall length at three heights, the floor-to-window height, the clear door width, the narrowest point on the route and the floor level along the run.

Contact

Layout and quote in two working days.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.