Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/The numbers we quote against.

The numbers we quote against.

One page, nine numbers. Anything that is not on this page is a preference instead of a specification, and a batch cannot be held to a preference.

Tolerance
± 2 mm on height and depth, batch to batch
Load
150 kg static, complete piece
Lead time
25–35 days from signed sheet
Spares
Two covers and one glide set per thirty
Two rows of upholstery swatch strips, pale tones on the upper row and the same families deeper on the lower row, like an open swatch book

What gets measured, and by whom

First piece, every batch

Height, depth, seat height, back height, top thickness and edge radius are measured on the first piece of every batch, with a steel rule and a radius gauge, by the person who will sign the packing list.

The rest, which is foam density, hide weight and tube wall, is checked on the mill certificate that comes with the batch and matched against the sheet. Both checks are written on the batch record instead of being remembered.

Tolerance, and why ± 2 mm

± 2 mm, batch to batch

Booth runs accumulate error. Each panel is ± 2 mm, so a run of six panels can be 12 mm out at the end when the errors all point the same way. That is what the filler panel is for, and why the run is dry-assembled in the shop first.

On chairs, ± 2 mm at the seat height matters because a mixed row is read at eye level. 2 mm goes unnoticed. 8 mm is visible across a row.

Load, stated honestly

150 kg static

150 kg static, tested on the complete piece. Not on the frame, and not calculated. Static means a weight placed and left, so it is neither a drop rating nor a fatigue rating.

We do not write certified, compliant or tested to standard, because a certificate number nobody can check is worth less than no claim.

What is not on the sheet

Decided by sample

Colour under a specific lamp, how a hide will age, and whether a steakhouse will feel right. Those are decided by a sample in the dining area, and we would rather send the sample than argue about a photograph.

Questions

Can you work to a drawing we already have?

Yes, and it is faster than starting from a blank sheet. Send the drawing with the fixing points marked, and the questions that come back are usually about the wall line and the door width instead of about the design.

What is the shortest honest lead time?

25 days on a stock hide and a stock powder, 35 on a custom colour, plus transit. Anything under 20 days means the goods are already built or the order is being resold.

Spec sheet

The nine numbers, and the tolerance behind them.

Open

Changes

Order changes are free in principle and expensive in practice once cutting starts.

Open

Grease

Grease buildup on seating in a grill room arrives as a film instead of a spill.

Open

Seat foam

Foam at 40 kg per cubic metre takes about 400,000 sittings before it loses 15 percent of its height.

Open

Alignment

Counter stool alignment is cumulative, so six stools at 10 mm out end up 60 mm out at the far end of a run.

Open

Brass

Brass accents on furniture are either solid, plated or lacquered, and each ages differently.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→