Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Touch-up

The repair kit that travels with the order is the difference.

Touch-up on site covers chips in a coating, scuffs on a cover and marks on a timber edge.

Include
coating pen, cover conditioner, timber wax
Match
the batch
Best window
the first hour

The route to the dining floor

Kits that travel with the order match the batch, and one bought later does not. The first hour after installation is when a touch-up is invisible. The first week is when the same mark becomes a replacement. Touch-in pen on a powder coat reads as a mark at arm's length, which is acceptable and better than rust.

Scuff on a hide cover often works out with a cloth and a little conditioner, which is cheaper than a recover.

What goes wrong on the day

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it.

Touch-up on site is expected and should be planned. Every finish travels with a small repair kit. The chip without a kit becomes a replaced part. The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour.

What to put in the method

Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice. Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position.

The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing rather than on site. The handover file should carry the assembly sequence, the fixing specification and the touch-up colour codes. Those three are what a maintenance team asks for first.

Temporary lighting tells the truth about colour. The dining area lit at 2700 K during the install and 3500 K at opening shows two different covers, and neither is wrong. Every model sits inside the steakhouse range.

What the sample should prove

Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it.

Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner. Who makes the frames is set out on the factory profile.

One more question

Should touch-up be in the contract?

Yes, as a line item. The kit with the batch reference on the tin is what makes year two possible.

Install time

Booth installation time runs to about an hour a row where the run arrives knocked down and bolted.

Open

Crew size

Installation crew size follows the heaviest piece instead of the total.

Open

Wobble

Table wobble comes from a floor that is not flat, a base that is not level, or a top that is not flat, in that order of likelihood.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→