Fixing heights
Fixing heights come off the furniture drawing rather than off the wall.
Open2 November 2026
Protecting finished work during a furniture install is mostly about the furniture itself: corner guards on every run, felt under every leg and cartons that stay on until the piece is in position.
Wall and floor finishes are the site's scope and their protection is the site's cost. Boundary agreed before delivery is what keeps a scratch from becoming an argument. Covering that is not fixed down moves and scuffs the finish underneath, which is the opposite of protection.
Protection left on too long traps moisture under a cover, which matters on a hide that has just been fitted.
Floor level decides how a run looks. The 25 mm fall across 6 m shows as a gap under one end, and the feet inside the plinth take 15 mm of it before anybody notices. Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery.
Touch-up on site is expected and should be planned. Every finish travels with a small repair kit. The chip without a kit becomes a replaced part. Fixing heights come off the furniture drawing.
The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back.
Getting a 2,400 mm run round a 90 degree corner on a 1,100 mm stair is arithmetic. The numbers either clear or they fail, and the stair does not argue. Measure the diagonal before the order is cut. Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint.
Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position. Escape routes stay clear through the install. Handover day is the easiest day of the job. Cartons stacked in a corridor are a fire risk, and they are our cartons. All 829 models are listed on the steakhouse furniture page.
Cartons come off in the order the pieces go in. Every piece stays wrapped until it is lifted into position, because a carton taken off early is a piece that gets moved twice. Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner.
Laser levels pay for themselves on a booth run. The run set out to a line 6 m long stays true. The run set out from one corner and a tape drifts 8 mm by the far end. Cleaning at the end of the install is part of the install. The furniture crew wipes the dust it made, and the handover is not finished until the covers are clean. Who makes the frames is set out on the factory profile.
The party that fitted it, on a date in the programme. Protection nobody owns stays until it becomes the problem.
Fixing heights come off the furniture drawing rather than off the wall.
OpenSpare parts on site cover the failures that happen in year one: glides, a cover or two and a hardware set.
OpenThe freight forwarder books space, prepares documents and handles the port process.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp