How it is built
The four stages, from green timber to packed carton.
OpenEvery figure on this page is counted from something you can ask to see. The floor is split six ways, the capacity figure comes off the bottleneck, and the last section says which three documents to request before a deposit.

Production holds 11,200 m² of the 20,000 m² site: cutting and framing in one bay, assembly in the next, upholstery and sewing along the far wall where the daylight is best. Powder coating sits apart at 1,600 m², because the four-stage pre-treatment and the cure oven need their own extraction.
Raw material takes 3,200 m², timber racked by species, hide by drum, foam cut to block and stored clear of the floor. Finished goods and the loading bay take 2,400 m², sampling and the showroom 1,000 m², office and inspection 600 m². Those six figures add up to the whole site, which is the point: a floor area quoted as one number says nothing about whether there is space for a buyer's order or only for the photographs.
The figure comes off the bottleneck instead of off the fastest machine. Coating is the constraint: one line, two shifts, a fixed cure time per rack, and every station upstream can outrun it while every station downstream waits for it. Count the racks per shift and the monthly number falls out of arithmetic instead of ambition.
Broken by range, a month carries 15,000 chairs, 6,500 booth seats, 4,500 tables, 2,800 stools and 1,200 benches. Those are planning figures on stock hide and a booked colour. Moving to a custom powder colour costs a day at the front of that line, which is where the 35-day end of the lead time comes from.
Fifty-five woodworking machines cover cutting, edge banding, boring and sanding. Twenty-four welding sets cover the frames and the cast-base brackets, split between MIG and TIG. Forty sewing machines and cutters handle hide. One coating line with four pre-treatment stages finishes the steel.
Nothing in that list is subcontracted. That is why a change to a drawing does not need a phone call outside the building.
Of the 115 people, 32 are on timber, 15 on welding and finishing, 28 on upholstery and sewing, 9 on coating, 12 on packing and loading, 6 on inspection, 5 in sampling and engineering, and 8 across management, purchasing and order follow-through. Inspection runs at one inspector to sixteen people on the floor, because it is a station the work passes through instead of a gate at the end.
Thirty thousand pieces a month is about 1,150 a working day across 26 days. Three hundred chairs is half a day of capacity, and no buyer gets them in half a day: the order joins a queue, the hide drum is booked, and the coating rack is shared with everything else in that batch.
The 25 to 35 days quoted elsewhere on this site is the queue plus the build plus the cure plus packing, 5 to 7 days of it is waiting for a slot instead of working on the order. Capacity sets how much the workshop can hold in a month. The schedule sets when one order moves through it, and the schedule is what a buyer is actually booking.
Ask for a video walk-through at a time you choose and the call goes through cutting, welding, upholstery, coating and packing in that order, with the camera pointed at whatever is on the floor that day instead of at a staged bay. Visiting is better: the site is in Lecong, Shunde, and a morning covers every department.
For a tender or a first order, three documents do more than any photograph. The production schedule for the week your order is planned in, the loading photographs from the previous batch, and the batch record with its drum and powder lot numbers. Ask for all three before the deposit instead of after it, and compare the schedule with the numbers on this page.
The plan on stock hide and a booked colour. Months made entirely of custom colours plan lower, and months with one large booth run plan higher, because booth seats take more coating rack space per unit than chairs.
Capacity is what the workshop can hold in a month. The queue is what one order waits in. Five to seven of those days are a slot instead of work, and a custom powder colour adds a day at the front of the coating line.
Ring first. Somebody has to walk the floor with you, and a department mid-batch is worth seeing properly instead of through a doorway. Mornings are usually easier than afternoons.
Not a full set on the site, and stock photography would defeat the purpose of the page. The video walk-through is the honest substitute, because it cannot be assembled from four different buildings.
The four stages, from green timber to packed carton.
OpenISO 9001, FSC and the test reports.
OpenPick a time and the camera follows the floor.
OpenFurniture welding is usually MIG at 3 to 4 mm fillet, and the failure point is the toe instead of the throat.
OpenBanquette depth is the seat depth plus the back thickness.
OpenTable top finishes run from catalysed lacquer to hard wax oil.
OpenFurniture carton dimensions should be chosen so that a layer fills the container width and the stack reaches the internal height.
OpenLeather hide size runs 4 to 6 square metres for a standard steer hide.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp