Sequence
Booth assembly sequence runs bases, tops, backs, then covers where the cover is a separate item.
Open10 August 2026
Floor level tolerance in an older building runs to 25 mm across 6 metres, and a run built true shows it as a gap under one end of the plinth.
Adjustable feet inside the plinth take 15 mm invisibly. Beyond that the gap needs a scribe allowance cut at the factory. Packing it out on site turns a furniture order into a building job. Packing goes in before the fixing, because packing after fixing puts the frame in a twist.
Floors that are level but not flat make a run rock rather than sit with a gap, which is the same fault with a different symptom.
Floor level decides how a run looks. The 25 mm fall across 6 m shows as a gap under one end, and the feet inside the plinth take 15 mm of it before anybody notices. Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor instead of the front door.
Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. Getting a 2,400 mm run round a 90 degree corner on a 1,100 mm stair is arithmetic.
The numbers either clear or they fail, and the stair does not argue. Measure the diagonal before the order is cut.
Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint. The scribe line is furniture work. The 30 mm filler panel cut at the factory covers the gap that a scribed back would leave visible.
Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way. Level and plumb are different tolerances, and a booth touches both. The floor that is level with a wall 15 mm out of plumb leaves a gap at the top that a filler panel has to close.
Lifts need booking and a lined car. Plywood on the floor and the walls before the first run goes up saves the door frame and the run, and it takes twenty minutes a lift. Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day. Every model sits inside the steakhouse range.
Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last.
Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it. Who makes the frames is set out on the factory profile.
The furniture does, up to 15 mm through the feet and further through a scribe allowance cut before delivery. Grinding a floor is a building decision and a separate budget.
Booth assembly sequence runs bases, tops, backs, then covers where the cover is a separate item.
OpenFurniture assembly tools for a booth install run to a cordless driver with the correct bit, a rubber mallet, a level, a tape, a knife and the hex keys matched to the hardware.
OpenWheelchair turning space is a 1,500 mm diameter clear circle.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp