Wholesale terms
MOQ 30 per line, and what the price is built on.
OpenMoney follows the material. Half of it buys hide, tube and powder at the moment they are committed. The other half is paid against a piece that exists. The split does not change with the size of the steakhouse.
Hide is bought by the drum and powder is ordered by the batch. Committing both to one order is what holds the colour across forty chairs, and a drum cannot go back once it has been cut. The deposit is the point where that commitment happens.
It also fixes the date. Stock hide and stock powder run 25 days. The custom colour runs 35, because the powder line is booked by the batch and not by the piece.
The balance falls due after inspection and before loading. Inspection can be a photograph set, a video call, or a third-party inspector at the workshop, and the balance does not depend on which one gets chosen.
It is not paid against a bill of lading. Made-to-order goods sitting in a container after they leave the yard are the one position a workshop cannot carry, and custom orders across the trade run on the same basis.
Changes are handled before cutting. Once a hide is laid out and a frame is welded, a change becomes a new piece instead of an adjustment, and the part already made stays in the order.
That window is wider than it sounds. Between the signed sheet and the cutting list there is usually a week of drawing work, which is where a different filler panel or a 40 mm change in booth height gets absorbed at no cost.
Invoice, packing list and certificate of origin travel with the shipment. Freight is quoted apart from the goods, so a change of forwarder does not move the unit price.
Bank charges sit with each side's own bank, which is the arrangement that survives a currency moving between quote and payment. Currency and rate basis are written on the quote itself instead of on this page.
The fifty-fifty split holds on repeat orders too. What changes is the speed: a repeat has the pattern and the colour signed off already, so it starts at the cutting list instead of at the drawing.
No. Made-to-order goods are paid before loading, and a buyer who needs credit terms should raise it at the tender stage instead of at the container.
Samples are charged at the unit price plus freight and paid in full up front. The unit price is credited against the order that follows, so the sample costs the freight and nothing else.
Ask before the order and the answer is written down either way. Documentary credit is not the standing route here, so raise it early if the order needs it.
MOQ 30 per line, and what the price is built on.
OpenThe documents a tender pack asks for.
OpenTwelve months whole piece, and what counts as wear.
OpenDimensions and seat count, then a per-line number.
OpenFurniture factory audit checks the workshop instead of the showroom: cutting, machining, upholstery.
OpenTimber at 8 to 12 percent moisture content stays where it was machined in a conditioned dining area.
OpenLCL and full container loading differ in cost per cubic metre and in damage risk.
OpenSteakhouse furniture site survey records five numbers: the wall length at three heights, the floor-to-window height, the clear door width, the narrowest point on the route and the floor level along the run.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp