Opening dates
Opening date planning works backwards through installation, shipping, production and sampling.
Open3 October 2026
Installation snag list for furniture covers paint, covers, stitching, gaps at a joint and anything that rocks.
Marks on a wall and damage to a floor belong to other trades and to a different list. Walked on the day of installation while the crew is on site, the list costs nothing. Raised a week later it is a return visit. Snags found after the dining area is in use are argued as damage rather than as installation faults.
Every snag that needs a part is recorded with the model and the carton, or the part arrives wrong.
Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.
Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position. The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible.
What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck. Photograph the dining area before the install starts. Damage found afterwards is a dispute that one date-stamped photograph prevents, and the photograph costs nothing to take.
Night work changes the crew and the quality. The install done between 22:00 and 06:00 is done by a tired team under temporary light, and the snag list reflects both. Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day.
Temporary lighting tells the truth about colour. The dining area lit at 2700 K during the install and 3500 K at opening shows two different covers, and neither is wrong. All 829 models are listed on the steakhouse furniture page.
Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it.
Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. Cleaning at the end of the install is part of the install. The furniture crew wipes the dust it made, and the handover is not finished until the covers are clean. Who makes the frames is set out on the factory profile.
The installer and the client's representative together, because a list agreed by one party is a list that gets disputed.
Opening date planning works backwards through installation, shipping, production and sampling.
OpenPhased installation is normal on a live site, and the cost is protection instead of labour.
OpenBooth seat overhang past the plinth runs 20 to 30 mm, which lets a guest's legs hang without catching the base.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp