Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Crew size

Two people for a run, four for a stone top.

Installation crew size follows the heaviest piece rather than the total.

Run
two people
Stone top
two, for weight
Rate
about eight runs a day

Access, floors and fixing

Booth run at 2,400 mm takes two people, and a 20 mm stone top on a 900 mm table takes two as well because of the weight and the fragility. Two people install about eight runs a day, which is the number a programme is built on. Three people on runs are slower than two, because the third has nowhere to hold.

The same crew often hangs the lights, which is where a knocked-down order saves or costs a day.

The site problems that repeat

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Lift size matters as much as door width. The 1,200 by 1,500 mm car takes a 2,000 mm run on the diagonal and nothing longer.

Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor instead of the front door. Getting a 2,400 mm run round a 90 degree corner on a 1,100 mm stair is arithmetic. The numbers either clear or they fail, and the stair does not argue. Measure the diagonal before the order is cut.

What the crew needs to know

The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible. Level and plumb are different tolerances, and a booth touches both. The floor that is level with a wall 15 mm out of plumb leaves a gap at the top that a filler panel has to close.

The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour. Lifts need booking and a lined car. Plywood on the floor and the walls before the first run goes up saves the door frame and the run, and it takes twenty minutes a lift.

Goods lifts are smaller than passenger lifts. The 1,400 mm car that takes a 2,400 mm run on the diagonal is often the only route upstairs, and its size belongs in the survey. Sizes, finishes and lead times are set out across steakhouse seating.

How to check it on a sample

Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last.

Cartons come off in the order the pieces go in. Every piece stays wrapped until it is lifted into position, because a carton taken off early is a piece that gets moved twice. Two people fit about 25 covers a day on loose furniture and 12 metres of booth run. Those are the numbers that turn an install into a programme instead of a hope. Who makes the frames is set out on the factory profile.

One more question

How long does a dining area take?

Eight runs and 40 chairs is about a day and a half for two people, plus a day for the snag list.

Egress

Egress with fixed seating is calculated on the clear width that remains once the run is in place.

Open

Anchoring

Wall anchoring for fixed seating uses fixings through the back into studs at 400 mm centres.

Open

Run length

Booth runs are built in lengths up to 2,400 mm and shipped in one piece where access allows.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→