One page is enough for a furniture install.

Installation method statement for furniture runs to one page: access, sequence, fixings, protection and who signs off.

Length
one page
Cover
access, sequence, fixings, protection, sign-off
Asked for
by a building manager

Building constraints

Longer documents do not get read on site, and a page that is not read is not a method. The same page is what a building manager asks for before a delivery goes through a shared entrance. Statement names the fixings, because that is the step that changes when a wall is not what the drawing assumed.

Method statements that leave out packing removal end with a stack of cartons in the wrong dining area.

Fixing and levelling

Stairs are the constraint that gets discovered late. The 1,100 mm stair with a turn sets the maximum length of every piece that goes upstairs, and that length is shorter than the drawing assumes. Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery.

The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour. The route from truck to table passes through more of the building than the dining room, and every part of it has a constraint.

What the drawing must record

What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck. The scribe line is furniture work. The 30 mm filler panel cut at the factory covers the gap that a scribed back would leave visible.

Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes. The handover file should carry the assembly sequence, the fixing specification and the touch-up colour codes. Those three are what a maintenance team asks for first. Quotations start from the Ember & Chair range.

What to ask the factory

Waste has to leave the same way the goods came in. The cardboard from 200 cartons is 60 kg of volume, and the building will not let it sit in the loading bay overnight. Escape routes stay clear through the install. Handover day is the easiest day of the job. Cartons stacked in a corridor are a fire risk, and they are our cartons.

Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner. Who makes the frames is set out on the factory profile.

One more question

Who writes it?

The factory, with the installer's access notes. The two should agree, because the site reads one page and follows it.

Site contacts

Site contact protocol for a furniture delivery gives the crew a drawing, a sequence and a named person on site.

Open

Protection

Protecting finished work during a furniture install is mostly about the furniture itself: corner guards on every run, felt under every leg and cartons that stay on until the piece is in position.

Open

Seat pans

Seat pan construction decides whether a chair can be repaired.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.