Route check
Delivery route check follows the path from the vehicle to the dining floor with the largest packed piece in mind.
Open5 July 2026
Door width for furniture sets the largest single piece that can enter the dining area, and 900 mm clear is the working number.
Clear width is the opening with the door open and the ironmongery counted, which is about 850 mm on a 900 mm frame. Below that, booth runs travel knocked down and the assembly hours move into the install programme. Booth runs at 2,400 mm pass a 900 mm door on the diagonal and not a 750 mm service door.
Double doors are often 1,600 mm and 800 mm a leaf, which is narrower than one 900 mm leaf for a wide piece.
Stairs are the constraint that gets discovered late. The 1,100 mm stair with a turn sets the maximum length of every piece that goes upstairs, and that length is shorter than the drawing assumes. Lift size matters as much as door width. The 1,200 by 1,500 mm car takes a 2,000 mm run on the diagonal and nothing longer.
Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor rather than the front door. Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint.
Photograph the dining area before the install starts. Damage found afterwards is a dispute that one date-stamped photograph prevents, and the photograph costs nothing to take. The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour.
Goods lifts are smaller than passenger lifts. The 1,400 mm car that takes a 2,400 mm run on the diagonal is often the only route upstairs, and its size belongs in the survey.
Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last. All 829 models are listed on the steakhouse furniture page.
Temporary lighting tells the truth about colour. The dining area lit at 2700 K during the install and 3500 K at opening shows two different covers, and neither is wrong. Two people fit about 25 covers a day on loose furniture and 12 metres of booth run. Those are the numbers that turn an install into a programme instead of a hope.
The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Handover includes the spare parts, the touch-in kit and the assembly drawings. The dining area without them is a dining area that calls the factory for a 2 dollar glide in year two. Who makes the frames is set out on the factory profile.
Temporarily on some frames, and that is the building owner's decision. It is cheaper than cutting a run.
Delivery route check follows the path from the vehicle to the dining floor with the largest packed piece in mind.
OpenSteakhouse furniture site survey records five numbers: the wall length at three heights, the floor-to-window height, the clear door width, the narrowest point on the route and the floor level along the run.
OpenAccessible route width is 900 mm clear to a table, with 1,500 mm of turning space at the end and a knee clearance of 620 mm at the table itself.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp