Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Spares on site

Two covers and a set of glides prevent most callbacks.

Spare parts on site cover the failures that happen in year one: glides, a cover or two and a hardware set.

Hold
glides, covers, hardware
Covers
two per dining area
Cost
a few per cent of the order

What the building allows

Those three handle most callbacks and cost a few per cent of the order. The alternative is a courier shipment for a part worth less than the freight. Glides are the most replaced part and the least ordered, because nobody thinks of them as a part.

Covers held on site have to come from the same cut as the dining area, or they will not match.

Where delivery stops

Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery. Touch-up on site is expected and should be planned. Every finish travels with a small repair kit. The chip without a kit becomes a replaced part.

Getting a 2,400 mm run round a 90 degree corner on a 1,100 mm stair is arithmetic. The numbers either clear or they fail, and the stair does not argue. Measure the diagonal before the order is cut. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.

What to check before dispatch

Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position. The route from truck to table passes through more of the building than the dining room, and every part of it has a constraint.

The scribe line is furniture work. The 30 mm filler panel cut at the factory covers the gap that a scribed back would leave visible. Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes. Our steakhouse furniture covers every model, size and finish.

What it costs at year five

Waste has to leave the same way the goods came in. The cardboard from 200 cartons is 60 kg of volume, and the building will not let it sit in the loading bay overnight. Cartons come off in the order the pieces go in. Every piece stays wrapped until it is lifted into position, because a carton taken off early is a piece that gets moved twice.

Cleaning at the end of the install is part of the install. The furniture crew wipes the dust it made, and the handover is not finished until the covers are clean. Handover includes the spare parts, the touch-in kit and the assembly drawings. The dining area without them is a dining area that calls the factory for a 2 dollar glide in year two. Who makes the frames is set out on the factory profile.

One more question

Where should spares be kept?

On site, labelled with the dining area and the dye lot. Spares in a warehouse are spares nobody can find.

As-built

As-built drawing records the dining area with the furniture in place, rather than the furniture on a drawing.

Open

Handover

Furniture handover pack carries the assembly sequence, the fixing schedule and the touch-up colour references.

Open

Schedule

The furniture maintenance schedule fits on one page and covers four frequencies: daily cleaning, weekly deep clean, quarterly inspection and annual conditioning.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→