Crew size
Installation crew size follows the heaviest piece instead of the total.
Open3 September 2026
Booth installation time runs to about an hour a row where the run arrives knocked down and bolted, and about twenty minutes where it arrives assembled and is fixed to the wall.
The difference is the argument for assembled delivery where the route allows it. Schedule built on the assembled number and delivered knocked down loses a day. Assembly time includes the fixing and the levelling, which are the two steps that cannot be hurried.
Second fix for covers adds about fifteen minutes a seat where the cover is a separate item.
Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it.
Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor rather than the front door. Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery.
Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.
The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible. Time an install against the opening date with a snagging buffer. Two different risks with two different fixes.
The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site. Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way. All 829 models are listed on the steakhouse furniture page.
The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour.
Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it. Who makes the frames is set out on the factory profile.
Because every splice is two joints, a levelling step and a check that the run is straight.
Installation crew size follows the heaviest piece instead of the total.
OpenEgress with fixed seating is calculated on the clear width that remains once the run is in place.
OpenBooth runs fix to a wall either through the back into studs, through the plinth into the floor.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp