Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Install time

One hour a row knocked down, twenty minutes assembled.

Booth installation time runs to about an hour a row where the run arrives knocked down and bolted, and about twenty minutes where it arrives assembled and is fixed to the wall.

Knock-down
about an hour a row
Assembled
about twenty minutes
Second fix
fifteen minutes a seat

Getting pieces into a dining area

The difference is the argument for assembled delivery where the route allows it. Schedule built on the assembled number and delivered knocked down loses a day. Assembly time includes the fixing and the levelling, which are the two steps that cannot be hurried.

Second fix for covers adds about fifteen minutes a seat where the cover is a separate item.

Levels and anchoring

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it.

Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor rather than the front door. Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery.

What to confirm on the survey

Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.

The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible. Time an install against the opening date with a snagging buffer. Two different risks with two different fixes.

The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site. Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way. All 829 models are listed on the steakhouse furniture page.

Where the money goes

The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour.

Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it. Who makes the frames is set out on the factory profile.

One more question

Why does a knocked-down row take three times as long?

Because every splice is two joints, a levelling step and a check that the run is straight.

Crew size

Installation crew size follows the heaviest piece instead of the total.

Open

Egress

Egress with fixed seating is calculated on the clear width that remains once the run is in place.

Open

Wall fixing

Booth runs fix to a wall either through the back into studs, through the plinth into the floor.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→