Site survey
Steakhouse furniture site survey records five numbers: the wall length at three heights, the floor-to-window height, the clear door width, the narrowest point on the route and the floor level along the run.
Open29 June 2026
Delivery route check follows the path from the vehicle to the dining floor with the largest packed piece in mind.
Booth runs ship at 2,400 mm and chairs at 0.19 cubic metres a piece, so the check is two numbers at each point: the clear width and the clear height where a piece has to tilt. Twenty minutes with a tape settles it, and the order follows the smaller number. Every route is as narrow as its narrowest point: 900 mm at the door and 750 mm at a fire door is a 750 mm route.
Tilting needs more height than carrying, so the ceiling is recorded at every turn. The doorway height says nothing about the landing.
Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Stairs are the constraint that gets discovered late. The 1,100 mm stair with a turn sets the maximum length of every piece that goes upstairs, and that length is shorter than the drawing assumes.
Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor instead of the front door. The route from truck to table passes through more of the building than the dining room, and every part of it has a constraint.
Level and plumb are different tolerances, and a booth touches both. The floor that is level with a wall 15 mm out of plumb leaves a gap at the top that a filler panel has to close. The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour.
Lifts need booking and a lined car. Plywood on the floor and the walls before the first run goes up saves the door frame and the run, and it takes twenty minutes a lift. Goods lifts are smaller than passenger lifts. The 1,400 mm car that takes a 2,400 mm run on the diagonal is often the only route upstairs, and its size belongs in the survey. Sizes, finishes and lead times are set out across steakhouse seating.
Escape routes stay clear through the install. Handover day is the easiest day of the job. Cartons stacked in a corridor are a fire risk, and they are our cartons. Responsibility for goods on site changes at handover of the space.
Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner.
Two people fit about 25 covers a day on loose furniture and 12 metres of booth run. Those are the numbers that turn an install into a programme instead of a hope. Laser levels pay for themselves on a booth run. The run set out to a line 6 m long stays true. The run set out from one corner and a tape drifts 8 mm by the far end. Who makes the frames is set out on the factory profile.
Knock-down. Booth runs ship in 45 per cent less volume that way, and the decision belongs before the order instead of after the container lands.
Steakhouse furniture site survey records five numbers: the wall length at three heights, the floor-to-window height, the clear door width, the narrowest point on the route and the floor level along the run.
OpenInstallation method statement for furniture runs to one page: access, sequence, fixings, protection and who signs off.
OpenRemoving chewing gum from a cover works by freezing it with an ice cube or a aerosol, then lifting it off in one piece.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp