Stairs
Stair carry limits the length of any piece that goes upstairs.
Open23 July 2026
Floor protection during installation belongs to whoever is on site.
The plinths and the trolley are the pieces that mark a floor, and the run stays exposed until the last carton is open. Corner guards on every run and felt under every leg cover the two contact points. Card taped down is the site's choice of method, and it is worth agreeing before delivery rather than after the first scratch.
Protection laid after the first delivery protects the floor and not the furniture, which is the half that shows. Tape on a finished floor leaves a residue that needs a solvent, and a solvent on a lacquered floor is the second problem.
Floor level decides how a run looks. The 25 mm fall across 6 m shows as a gap under one end, and the feet inside the plinth take 15 mm of it before anybody notices. Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor instead of the front door.
Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.
Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position. The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site.
Lifts need booking and a lined car. Plywood on the floor and the walls before the first run goes up saves the door frame and the run, and it takes twenty minutes a lift. Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day. Our steakhouse furniture covers every model, size and finish.
Cartons come off in the order the pieces go in. Every piece stays wrapped until it is lifted into position, because a carton taken off early is a piece that gets moved twice. Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme.
Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner. Laser levels pay for themselves on a booth run. The run set out to a line 6 m long stays true. The run set out from one corner and a tape drifts 8 mm by the far end. Who makes the frames is set out on the factory profile.
By an hour a dining area. The same hour is spent twice if a plinth has to be replaced.
Stair carry limits the length of any piece that goes upstairs.
OpenLift size decides what goes upstairs in one piece.
OpenStool height for a 1,050 mm counter sits between 650 and 680 mm.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp