Most of the waste is the packing we chose.

Installation waste from a 60 seat dining area runs to about 8 cubic metres of cardboard and timber packing, and most of that is a design decision rather than a site habit.

Per 60 seats
about 8 m³
Knocked down
45 per cent less volume
Cheapest
packing leaves on the vehicle

Building constraints

Knocked-down booth runs ship in 45 per cent less volume than assembled ones, so the same dining area produces less to dispose of. Removing packing on the delivery vehicle is the cheapest option and it needs agreeing before the delivery instead of at the door. Cardboard flattened on site takes a quarter of the space, which changes the skip size and the collection cost.

Packaging that leaves on the vehicle needs a loading plan, because the truck fills up with what came off it.

Fixing and levelling

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Lift size matters as much as door width. The 1,200 by 1,500 mm car takes a 2,000 mm run on the diagonal and nothing longer.

Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery. Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint.

What the drawing must record

The route from truck to table passes through more of the building than the dining room, and every part of it has a constraint. What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck.

Waste has to leave the same way the goods came in. The cardboard from 200 cartons is 60 kg of volume, and the building will not let it sit in the loading bay overnight. Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day.

Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it. Quotations start from the Ember & Chair range.

What to ask the factory

Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner.

The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Who makes the frames is set out on the factory profile.

One more question

Can the packing leave with the truck?

Often, for a fee, and it is cheaper than a skip because the vehicle is already there and already empty.

Touch-up

Touch-up on site covers chips in a coating, scuffs on a cover and marks on a timber edge.

Open

Install time

Booth installation time runs to about an hour a row where the run arrives knocked down and bolted.

Open

The window

Freight damage lives inside a window set by the carrier.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.