Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/As-built

The as-built drawing shows where each piece landed. What was ordered is on the order sheet.

As-built drawing records the dining area with the furniture in place, rather than the furniture on a drawing.

Records
the dining area, furniture in place
Mark
scribes and packers
Used at
a refit

Building constraints

The difference matters at a refit, because the next order has to fit the dining area instead of the last order. Marking the scribe lines and the packers is what makes the drawing useful at month thirty. Drawings that show only the furniture cannot be used to order anything else for the dining area.

Recording where a packer went under a plinth tells the next installer where the floor moves.

Fixing and levelling

Floor level decides how a run looks. The 25 mm fall across 6 m shows as a gap under one end, and the feet inside the plinth take 15 mm of it before anybody notices. Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it.

Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice.

What the drawing must record

The route from truck to table passes through more of the building than the dining room, and every part of it has a constraint. What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck.

Level and plumb are different tolerances, and a booth touches both. The floor that is level with a wall 15 mm out of plumb leaves a gap at the top that a filler panel has to close. Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes. Quotations start from the Ember & Chair range.

What to ask the factory

Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day. Cartons come off in the order the pieces go in. Every piece stays wrapped until it is lifted into position, because a carton taken off early is a piece that gets moved twice.

Anchor points are drilled to the furniture drawing. The fitter's judgement changes from day to day. Socket 40 mm below the fixing line is the case the drawing exists to catch, and missing it costs a delay instead of a repair. The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Who makes the frames is set out on the factory profile.

One more question

Who draws it?

The factory, from the installation sheet and the photographs. Any drawing office that never saw the dining area can only reproduce the order.

Handover

Furniture handover pack carries the assembly sequence, the fixing schedule and the touch-up colour references.

Open

Snag lists

Installation snag list for furniture covers paint, covers, stitching, gaps at a joint and anything that rocks.

Open

Lumbar

Lumbar support on a chair or booth back sits 180 to 220 mm above the seat.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→