One named person on each side, or the crew waits.

Site contact protocol for a furniture delivery gives the crew a drawing, a sequence and a named person on site.

Give
drawing, sequence, contact
Contact
on site
Printed
not on a phone

The route to the dining floor

Without all three the first question stops the job, and the question is usually about access rather than about furniture. The named person should be on site instead of in an office, because a call answered in two hours costs a morning. Someone who is not on site answers in two hours what a site manager answers in two minutes.

The drawing and the sequence are printed and on site, because a phone screen is not readable in a dusty dining area.

What goes wrong on the day

Phasing is normal on a live site. Installing half the floor early means protecting it for weeks, and protection costs less than a second delivery. Touch-up on site is expected and should be planned. Every finish travels with a small repair kit. The chip without a kit becomes a replaced part.

The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour. Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position.

What to put in the method

The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible. What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck.

Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes. The handover file should carry the assembly sequence, the fixing specification and the touch-up colour codes. Those three are what a maintenance team asks for first. Every model sits inside the steakhouse range.

What the sample should prove

Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. Responsibility for goods on site changes at handover of the space. Delivery only moves the cartons. Somebody has to be named as the custodian, or the first missing carton has no owner.

Anchor points are drilled to the furniture drawing. The fitter's judgement changes from day to day. Socket 40 mm below the fixing line is the case the drawing exists to catch, and missing it costs a delay instead of a repair. Cleaning at the end of the install is part of the install. The furniture crew wipes the dust it made, and the handover is not finished until the covers are clean. Who makes the frames is set out on the factory profile.

One more question

What if there is no site manager?

Nominate one before the delivery. Delivery that arrives to nobody becomes a storage problem.

Protection

Protecting finished work during a furniture install is mostly about the furniture itself: corner guards on every run, felt under every leg and cartons that stay on until the piece is in position.

Open

Fixing heights

Fixing heights come off the furniture drawing instead of off the wall.

Open

Patina

Leather patina is the darkening and softening that a hide develops with use.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.