Floor level
Floor level tolerance in an older building runs to 25 mm across 6 metres.
Open16 August 2026
Wall anchoring for fixed seating uses fixings through the back into studs at 400 mm centres, or through the plinth into the floor.
Plasterboard alone takes neither, and a run fixed to plaster moves the first time somebody leans on it. The fixing method is drawn by the factory and installed by the fitter, and the drawing names the fixing rather than leaving it to the day. Fixing into a timber stud holds about 400 N in pull-out, and the same fixing into plasterboard holds a fraction of that.
Runs along a glass wall are free-standing or floor fixed and braced, never through the glass.
Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it. Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back.
Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint. Protection on a live site is part of the furniture method. Corner guards and felt pads cost a fraction of the first replaced panel, and cartons stay on until the piece is in position.
The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site. Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way.
The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour. Lifts need booking and a lined car. Plywood on the floor and the walls before the first run goes up saves the door frame and the run, and it takes twenty minutes a lift.
Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day. Quotations start from the Ember & Chair range.
Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last.
Two people fit about 25 covers a day on loose furniture and 12 metres of booth run. Those are the numbers that turn an install into a programme instead of a hope. Anchor points are drilled to the furniture drawing. The fitter's judgement changes from day to day. Socket 40 mm below the fixing line is the case the drawing exists to catch, and missing it costs a delay instead of a repair. Who makes the frames is set out on the factory profile.
From the survey, before the order. Ten minutes with a stud finder settles the fixing schedule. After installation it means resin anchors.
Floor level tolerance in an older building runs to 25 mm across 6 metres.
OpenBooth assembly sequence runs bases, tops, backs, then covers where the cover is a separate item.
OpenFurniture carton dimensions should be chosen so that a layer fills the container width and the stack reaches the internal height.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp