Opening date planning works backwards through installation, shipping, production and sampling.
Production runs 25 to 35 days from the signed sample, and shipping needs two weeks of slack that a forward schedule never leaves. Plans built forward from the order date arrive two weeks late and look reasonable at every step. Soft openings are the buffer, and a hard opening with no slack turns a four day vessel delay into a missed date.
The sample date is the first scheduled item and the one most often left out. That is why the plan starts there.
Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Stairs are the constraint that gets discovered late. The 1,100 mm stair with a turn sets the maximum length of every piece that goes upstairs, and that length is shorter than the drawing assumes.
The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour. Levelling is done before anchoring, never after. Runs anchored level to an unlevel floor hold the frame in a twist that shows at every joint.
The snag list should be walked the same day as the install, while the crew is still there and the pieces are still accessible. Time an install against the opening date with a snagging buffer. Two different risks with two different fixes.
Photograph the dining area before the install starts. Damage found afterwards is a dispute that one date-stamped photograph prevents, and the photograph costs nothing to take. Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes.
Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement rather than in a call on the day. Sizes, finishes and lead times are set out across steakhouse seating.
Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it.
Site access needs names before it needs tools. The crew that turns up without passes spends the first morning at the gate, and that morning is in the programme. The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Who makes the frames is set out on the factory profile.
Ten weeks for a first order and six for a repeat, which is sampling plus production plus shipping.
Phased installation is normal on a live site, and the cost is protection instead of labour.
OpenInstallation waste from a 60 seat dining area runs to about 8 cubic metres of cardboard and timber packing.
OpenContainer condensation forms where warm moist air meets a cold surface.
OpenDoors, stairs, floors, anchoring and the sequence that keeps an opening date.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp