Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Tools

The right driver bit saves more time than an extra pair of hands.

Furniture assembly tools for a booth install run to a cordless driver with the correct bit, a rubber mallet, a level, a tape, a knife and the hex keys matched to the hardware.

Driver
correct bit, clutch set
Also
mallet, level, knife, hex keys
Hardware
bagged per run

Access, floors and fixing

Kits that arrive bagged per run mean one bag per row rather than a box to sort. The bit is the item that stops a job, because a run uses one fastener size and a crew with the wrong bit cannot start. Impact driver on a thread insert strips the insert, so the clutch setting matters more than the torque.

Spare glides and two covers travel with the kit, because those are the parts replaced in year one.

The site problems that repeat

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Lift size matters as much as door width. The 1,200 by 1,500 mm car takes a 2,000 mm run on the diagonal and nothing longer.

Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it. The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour.

What the crew needs to know

Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice. The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site.

Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last.

Temporary lighting tells the truth about colour. The dining area lit at 2700 K during the install and 3500 K at opening shows two different covers, and neither is wrong. Two people fit about 25 covers a day on loose furniture and 12 metres of booth run. Those are the numbers that turn an install into a programme instead of a hope. Sizes, finishes and lead times are set out across steakhouse seating.

How to check it on a sample

Laser levels pay for themselves on a booth run. The run set out to a line 6 m long stays true. The run set out from one corner and a tape drifts 8 mm by the far end. Cleaning at the end of the install is part of the install. The furniture crew wipes the dust it made, and the handover is not finished until the covers are clean.

Handover includes the spare parts, the touch-in kit and the assembly drawings. The dining area without them is a dining area that calls the factory for a 2 dollar glide in year two. Who makes the frames is set out on the factory profile.

One more question

Should the factory send tools?

It should send the bits, the hex keys and the glides, because all three are specific to the hardware. The rest is standard site kit.

Floor protection

Floor protection during installation belongs to whoever is on site.

Open

Stairs

Stair carry limits the length of any piece that goes upstairs.

Open

Chair width

Dining chair width runs 450 to 520 mm at the seat, and 480 mm is the number that lets two chairs sit side by side at a 1,400 mm table without touching.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→