Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Handover

Three things a maintenance team asks for first.

Furniture handover pack carries the assembly sequence, the fixing schedule and the touch-up colour references.

Carry
sequence, fixing schedule, touch-up codes
Also
cover reference and dye lot
Asked for
by maintenance, first

The route to the dining floor

Those three are what a maintenance team asks for first and the three that get lost. The pack also carries the cover reference and the dye lot, which is what makes a reorder possible at month eighteen. Handover without a fixing schedule means the next person to move a run invents one.

Cover references and dye lots are what make a reorder possible two years after the dining area opened.

What goes wrong on the day

Anchoring is part of the furniture specification. Drywall takes a different fixing from brick, and a run that relies on the wrong one moves the first time somebody leans on it. Touch-up on site is expected and should be planned. Every finish travels with a small repair kit. The chip without a kit becomes a replaced part.

Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. The crew needs a drawing, a sequence and a named contact. Without all three, the first question stops the job for an hour.

What to put in the method

Sequence matters: bases, then tops, then backs, then covers on site where the cover is a separate item. Doing it the other way means moving finished pieces twice. What goes wrong on the day is almost always access. Pieces that fit the dining area but not the lift go back on the truck.

Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way. Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes. Every model sits inside the steakhouse range.

What the sample should prove

The handover file should carry the assembly sequence, the fixing specification and the touch-up colour codes. Those three are what a maintenance team asks for first. Temporary lighting tells the truth about colour. The dining area lit at 2700 K during the install and 3500 K at opening shows two different covers, and neither is wrong.

The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Handover includes the spare parts, the touch-in kit and the assembly drawings. The dining area without them is a dining area that calls the factory for a 2 dollar glide in year two. Who makes the frames is set out on the factory profile.

One more question

Does handover include training?

For a maintenance team, an hour on cleaning and touch-up is worth more than a folder. Both belong in the pack.

Snag lists

Installation snag list for furniture covers paint, covers, stitching, gaps at a joint and anything that rocks.

Open

Opening dates

Opening date planning works backwards through installation, shipping, production and sampling.

Open

Rust

Rust prevention on steel furniture comes down to the coating and the drainage. The steel grade does less than buyers expect.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→