Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Egress

Fixed seating changes how a dining area empties, and the projection is ours.

Egress with fixed seating is calculated on the clear width that remains once the run is in place. The seat count is a separate sum.

Measured
clear width with furniture in place
Projection
700 mm for a booth
Worst point
where a run meets a door

What the building allows

Booth runs project 700 mm into a 1,200 mm aisle and leave 500 mm, which is below what a dining area needs. The number belongs on the furniture drawing, because the projection is a furniture dimension and the review is the dining area's. Movable chairs push aside in an emergency and a fixed run does not. That is why the two calculations differ.

Egress width is measured at the narrowest point on the way out, which is often where a run meets a service door.

Where delivery stops

Door width decides what can arrive assembled. Below 900 mm clear, booth runs travel knocked down and the assembly hours go into the install programme. Delivery stops where the route stops. The survey should record the narrowest point between the truck and the dining floor, which is often a service corridor rather than the front door.

Fixing heights come off the furniture drawing. The finished wall moves, and the drawing does not. Fixed 30 mm low, the run closes the seat gap at one end and no shim moves it back. The wall decides the run. The dining area that cannot take a 2.4 m run gets a spliced run, and the splice belongs in the drawing instead of on site.

Fixing to a stud wall needs a pattress behind the board or a counterweighted base. The choice depends on whether the run can move, and the factory draws the fixing either way. Leave the survey drawing with the building dimensions on it. The next person to work in the dining area needs the drawing. The order number says nothing about where the piece goes.

What to check before dispatch

The unloading point is a decision made before the truck arrives. The 20 m carry through a finished dining room takes four people and a day. The same goods dropped at the service door take two and an hour. Goods lifts are smaller than passenger lifts. The 1,400 mm car that takes a 2,400 mm run on the diagonal is often the only route upstairs, and its size belongs in the survey.

Power and light come from the site, and the furniture method says what it needs. One socket for a drill and 300 lux to see a joint is the minimum, and it belongs in the method statement instead of in a call on the day.

Other trades work at the same time as the install. Booth runs fitted before the wall finish take a dust coat on the hide that no cleaning schedule removes. That is why furniture goes last. Our steakhouse furniture covers every model, size and finish.

What it costs at year five

Cutting on site is a decision made at the factory. Every joint cut in the dining room leaves a film on every cover. That is why the run arrives with the scribe allowance already on it.

The final walk happens 48 hours before opening. On the morning there is no time left to fix what the walk turns up. Two days is enough to replace a part and not enough to re-plan a run, which is what makes it the right deadline. Who makes the frames is set out on the factory profile.

One more question

Does every dining area need the calculation?

Every dining area with fixed seating does. The furniture drawing supplies the projection and the dining area review sets the number.

Anchoring

Wall anchoring for fixed seating uses fixings through the back into studs at 400 mm centres.

Open

Floor level

Floor level tolerance in an older building runs to 25 mm across 6 metres.

Open

Overhang

Counter overhang at 300 mm lets a 460 mm seat slide under the ledge.

Open

Installation on site

Doors, stairs, floors, anchoring and the sequence that keeps an opening date.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→