Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Sourcing and terms

Sourcing and terms, in 25 notes.

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Articles
25
Newest
12 November 2026
Oldest
21 June 2026
  • Second ordersSecond order planning is different from the first, because the object is defined and the only variables are quantity, colour and date.
  • ValidityFurniture quote validity is usually 30 to 60 days, because hide and steel are commodities and both move.
  • ToolingFurniture tooling ownership is decided by who paid, and most buyers assume it transfers without saying so.
  • LiabilityProduct liability for furniture sits with the party that placed the piece on the market, which is usually the seller rather than the factory.
  • InspectionThird party inspection on furniture costs a few hundred pounds per shipment and checks a sample of pieces against the approved sample.
  • ClaimsFurniture quality claims settle on evidence, and evidence is three things: the model code, the carton number and a photograph in focus.
  • WarrantyFurniture warranty terms usually cover frame structure for five years and covers for one, because a cover is a wear item and a frame is not.
  • SparesFurniture spare parts should be ordered with the furniture, because the parts match the batch and the batch runs out.
  • ReordersReorder colour matching fails across three materials at once: hide, powder coat and stain.
  • ChangesOrder changes are free in principle and expensive in practice once cutting starts.
  • InsuranceFurniture shipping insurance claims fail on the baseline instead of on the loss.
  • IncotermsIncoterms for furniture are usually EXW, FOB or DDP, and the choice decides who carries risk at which point.
  • DepositsFurniture deposit at 30 percent does two jobs: it funds material and it fixes a place in the queue.
  • ContractsFurniture contract terms work as five short documents: a drawing, a specification, a sample reference, a schedule and a change procedure.
  • HolidaysFactory holiday schedule affects a project more than a shipping delay, because production stops and does not catch up.
  • Peak seasonFurniture production peaks in the weeks before the northern spring and autumn openings, when most dining areas are finishing.
  • Lead timeFurniture lead time of 25 to 35 days runs from the approved sample instead of from the payment, and the 7 to 10 days of sampling sits inside that window.
  • VolumeFurniture volume discount is not linear, because the cost structure changes with quantity.
  • Chair pricePrice per steakhouse chair spans a factor of three between a powder coated steel frame with a PU seat and a solid beech frame with a full grain hide cover.
  • VerificationThe order for 120 seats can pass through four hands before a saw is switched on: the one that sells, the one that makes the frame, the one that coats it and the one that loads the container.
  • AuditsFurniture factory audit checks the workshop instead of the showroom: cutting, machining, upholstery, coating and packing, in that order.
  • QuotationsFurniture quotation breakdown runs to material, labour, coating, packing and margin, and a quote that shows only a total cannot be compared with another.
  • Payment termsFurniture payment terms are usually 30 percent with the order and 70 percent against shipping documents, which protects the buyer against non-delivery and the factory against cancellation.
  • SamplesFurniture sample cost runs 1.5 to 2 times the production price of the piece, and it is credited against the order when one follows.
  • MOQThe minimum order quantity on upholstered seating is 30 pieces per line, and the number comes from material instead of from policy.

Contact

Layout and quote in two working days.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→