Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design

Thirty seats is where a cutting list stops being waste.

The minimum order quantity on upholstered seating is 30 pieces per line, and the number comes from material rather than from policy.

MOQ
30 per line
Reason
hide, sheet and coating batch
Mixed order
counts per line

What a factory can promise

The single booth run consumes a full hide, a full sheet of ply and a full powder batch, and most of each is waste at one piece. Below 30 the price per seat rises faster than the quantity falls. MOQ is per line instead of per order, so a mixed order of 30 chairs and 30 stools meets it twice.

The factory that quotes a lower minimum than its material supply supports is a factory that will renegotiate at the cutting stage.

Where orders go wrong

MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Sample cost is credited against the order, which means it is a commitment device instead of a charge. Buyers who never order pay for the workshop time. Buyers who do, do not.

The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price.

What to agree in writing

What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves. Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security.

Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Every model sits inside the steakhouse range.

What it costs at year five

Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way.

Price increases need notice. The explanation two weeks later does not help the buyer who has already quoted. Thirty days of notice on a hide increase lets a buyer place a forward order. The increase announced on the day it applies moves the argument to the invoice. Reorders should reuse the drawing, the colour card and the packing list from the first order. Starting a reorder from a conversation is how the second batch comes back 40 mm narrower than the first. The workshop floor is described on our workshop.

One more question

Can a smaller sample order be placed?

As a sample, yes, at sample cost. The sample route exists for exactly this, and the cost is credited if the order follows.

Second orders

Second order planning is different from the first, because the object is defined and the only variables are quantity, colour and date.

Open

Validity

Furniture quote validity is usually 30 to 60 days, because hide and steel are commodities and both move.

Open

Floor protection

Floor protection during installation belongs to whoever is on site.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→