Audits
Furniture factory audit checks the workshop instead of the showroom: cutting, machining, upholstery.
Open21 July 2026
The order for 120 seats can pass through four hands before a saw is switched on: the one that sells, the one that makes the frame, the one that coats it and the one that loads the container.
Writing all four on the quote takes an hour and it decides who answers a joint question in year two. The name on the invoice is the one worth having in writing, because it is the name that carries the claim. The workshop that makes the frame and buys the top is normal, and knowing which part is what makes a specification enforceable.
MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Sample cost is credited against the order, which means it is a commitment device rather than a charge. Buyers who never order pay for the workshop time. Buyers who do, do not.
Capacity is a calendar. Ask which week the line is booked. Monthly capacity is what the workshop can do, and the booking is when it will do yours. Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation.
What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price. What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves.
The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. Sampling takes seven to ten working days and the freight is usually on the buyer. Building the sample into the lead time at the quotation stage is what stops the first order arriving late. Every model sits inside the steakhouse range.
Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Warranty of two years on frames and one year on covers is a normal split, and the split matters more than the length.
Failures at the joint are a frame matter. Failures at the seam are a cover matter.
Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair. Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. The workshop floor is described on our workshop.
Ask for a video call from the workshop floor with the current order visible. The recorded video proves nothing and a live call is hard to stage.
Furniture factory audit checks the workshop instead of the showroom: cutting, machining, upholstery.
OpenFurniture quotation breakdown runs to material, labour, coating, packing and margin.
OpenTightening furniture frames is a schedule instead of a repair.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp