Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Incoterms

EXW and DDP differ by more than the freight line.

Incoterms for furniture are usually EXW, FOB or DDP, and the choice decides who carries risk at which point.

EXW
buyer carries everything after the gate
FOB
risk at the ship's rail
DDP
seller carries to the door

Capacity and calendar

EXW puts everything after the factory gate on the buyer, including export clearance. DDP puts it all on the seller. That is why the DDP price carries insurance and a margin on the unknown. The DDP price is only comparable with another DDP price, because the seller's freight assumptions are hidden inside it.

Risk transfer and cost transfer happen at the same point under Incoterms, which is the part buyers miss when comparing EXW with FOB.

The delays that repeat

Payment terms protect the buyer against delivery and the factory against cancellation. Thirty percent deposit and seventy on documents is the arrangement that keeps both sides interested.

Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.

What to confirm before paying

The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price.

Cost is decided at the drawing stage and only recorded at the invoice. By the time a quote looks expensive, the decisions that made it expensive are already fixed. Insurance and title transfer are commercial terms that get ignored until a container is lost. Agree them before the first shipment. Agreeing them afterwards means a re-make.

Sampling takes seven to ten working days and the freight is usually on the buyer. Building the sample into the lead time at the quotation stage is what stops the first order arriving late. Currency matters on anything over sixty days. The quote in dollars against costs in renminbi moves three percent on a bad month, and the clause that reopens the price past that point protects both sides. Sizes, finishes and lead times are set out across steakhouse seating.

What the sample should prove

Step pricing should be quoted as three lines from the start: thirty seats, one hundred, three hundred. The buyer who learns the third price after committing to the first feels misled even when nothing was hidden. Exclusivity is a volume commitment. Territory protection tied to an annual quantity protects the buyer who actually buys, and it should lapse quietly if the quantity is not met.

Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.

One more question

Which term should a first order use?

FOB, because it puts the sea freight under the buyer's control while leaving the export process with the seller, who does it weekly.

Deposits

Furniture deposit at 30 percent does two jobs: it funds material and it fixes a place in the queue.

Open

Contracts

Furniture contract terms work as five short documents: a drawing, a specification, a sample reference, a schedule and a change procedure.

Open

Dye lots

Leather dye lot variation is measured in Delta E, and a difference of 1 is invisible while a difference of 2.5 reads as two colours on a wall.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→