The deposit is a schedule commitment on both sides.

Furniture deposit at 30 percent does two jobs: it funds material and it fixes a place in the queue.

Standard
30 percent
Fixes
queue position and sample date
Non-refundable after
cutting starts

How a quotation is built

Once it clears, the sample date is fixed and the delivery window starts. The deposit paid before the drawing is agreed is a deposit against an object that has not been defined. The deposit that clears late moves the queue position. That is why the payment date matters more than the percentage.

Deposits are usually non-refundable after cutting, and the point at which that starts should be written rather than assumed.

What gets renegotiated

Sample cost is credited against the order, which means it is a commitment device instead of a charge. Buyers who never order pay for the workshop time. Buyers who do, do not. Payment terms protect the buyer against delivery and the factory against cancellation. Thirty percent deposit and seventy on documents is the arrangement that keeps both sides interested.

Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature. The calendar has two bottlenecks: sampling and coating. Cutting and assembly absorb change. The colour batch does not.

What to put in the contract

Orders placed before a national holiday lose two to three weeks of effective production, and that has to be in the schedule instead of in an apology. Documents that protect both sides are short: a drawing, a specification, a sample reference, a schedule and a change procedure. Anything longer is usually unread.

Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security. The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. Our steakhouse furniture covers every model, size and finish.

Where the money goes

Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Currency matters on anything over sixty days. The quote in dollars against costs in renminbi moves three percent on a bad month, and the clause that reopens the price past that point protects both sides.

Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.

One more question

Can the deposit be lower?

Sometimes, at a higher unit price. The deposit funds the material, so a lower one is a higher price for the same goods.

Contracts

Furniture contract terms work as five short documents: a drawing, a specification, a sample reference, a schedule and a change procedure.

Open

Holidays

Factory holiday schedule affects a project more than a shipping delay, because production stops and does not catch up.

Open

Schedule

The furniture maintenance schedule fits on one page and covers four frequencies: daily cleaning, weekly deep clean, quarterly inspection and annual conditioning.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.