Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Reorders

The reorder eight months later will not match, unless the lot was reserved.

Reorder colour matching fails across three materials at once: hide, powder coat and stain.

Materials
hide, powder, stain
Powder drift
past 18 months
Fix
reserve material at the first order

Quantity, sample and price

Each has a lot that changes, and each will read differently against the original. Reserving material at the first order is the only reliable route, and it is cheap compared with recovering a run. Powder coat drift becomes visible past about eighteen months. That is why a reorder for a frame needs a reserved batch rather than a colour code.

The small reorder of ten seats against a dining area of ninety will read as a different dining area if it comes from a new lot.

The assumptions that fail

MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Third party inspection is worth the fee on a first order and rarely worth it on a repeat. The first order is where the assumptions differ. The repeat is where they have already been tested.

Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation.

Terms worth fixing early

Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.

The calendar has two bottlenecks: sampling and coating. Cutting and assembly absorb change. The colour batch does not. Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around.

Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Quotations start from the Ember & Chair range.

How to check it on a sample

The contract needs three attachments. One attachment leaves the other two open to argument. The drawing, the approved colour card and the packing list are the documents a dispute actually turns on, and the purchase order text is not one of them. Currency matters on anything over sixty days. The quote in dollars against costs in renminbi moves three percent on a bad month, and the clause that reopens the price past that point protects both sides.

Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Reorders should reuse the drawing, the colour card and the packing list from the first order. Starting a reorder from a conversation is how the second batch comes back 40 mm narrower than the first. The workshop floor is described on our workshop.

One more question

How much does reserving cost?

Usually nothing at the first order and a storage charge later. It is worth asking for a reserved batch quote.

Changes

Order changes are free in principle and expensive in practice once cutting starts.

Open

Insurance

Furniture shipping insurance claims fail on the baseline instead of on the loss.

Open

Blackened steel

Blackened steel is chemically treated instead of coated, so the colour is in the surface instead of on it.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→