Validity
Furniture quote validity is usually 30 to 60 days, because hide and steel are commodities and both move.
Open12 November 2026
Second order planning is different from the first, because the object is defined and the only variables are quantity, colour and date.
That makes a second order faster and cheaper, and it also makes it the point where a dining area adds twenty seats at a colour that no longer exists. Planning the add-on with the original order avoids that. Add-on seating at month eighteen is the most common colour problem, because the lot has changed on every material at once.
The second order is the right time to reserve material for a third, because the batch is current and the storage cost is small.
MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Third party inspection is worth the fee on a first order and rarely worth it on a repeat. The first order is where the assumptions differ. The repeat is where they have already been tested.
Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.
Tooling is a one-off that belongs to the buyer only if the buyer pays for it. Confirm ownership in writing or expect to pay again on a repeat order. Deposits are schedule commitments on both sides. Once it clears, the sample date is fixed and the delivery window starts, so the sequence matters more than the percentage.
The calendar has two bottlenecks: sampling and coating. Cutting and assembly absorb change. The colour batch does not. Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around.
Cost is decided at the drawing stage and only recorded at the invoice. By the time a quote looks expensive, the decisions that made it expensive are already fixed. Quotations carry a validity date for a reason. Thirty days is normal and hide moves weekly, so a quote accepted in month three is a quote that gets renegotiated or quietly downgraded in the cover. All 829 models are listed on the steakhouse furniture page.
Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Packing cost belongs in the unit price or in a separate line, never in neither. The quote that excludes cartons and pallets is ten percent cheaper on paper and level in the invoice.
Step pricing should be quoted as three lines from the start: thirty seats, one hundred, three hundred. The buyer who learns the third price after committing to the first feels misled even when nothing was hidden. The workshop floor is described on our workshop.
Yes, and a cover set from the same batch, because that is the last time the colour will match.
Furniture quote validity is usually 30 to 60 days, because hide and steel are commodities and both move.
OpenFurniture tooling ownership is decided by who paid, and most buyers assume it transfers without saying so.
OpenPowder coat colour matching across a reorder is unreliable beyond about eighteen months.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp