Five documents protect both sides, and none of them is long.

Furniture contract terms work as five short documents: a drawing, a specification, a sample reference, a schedule and a change procedure.

Documents
drawing, spec, sample, schedule, change
Strongest
the drawing
Exercised
the change procedure

Quantity, sample and price

Anything longer is usually unread, and the terms that matter are the ones that describe the object instead of the dispute. The contract that specifies a chair by name is weaker than one that specifies it by drawing. The drawing can be measured and a name cannot. That is why the drawing is the document that settles an argument.

The change procedure is the clause that gets exercised, so it should state a date, a cost and a signature instead of a principle.

The assumptions that fail

Sample cost is credited against the order, which means it is a commitment device instead of a charge. Buyers who never order pay for the workshop time. Buyers who do, do not. Lead time runs 25 to 35 days from the approved sample. The seven to ten days inside that is sampling, and it is the part that gets forgotten in a schedule.

Quotations without a specification are numbers without a meaning. Two quotes for the same chair at different prices are usually two different chairs. Contracts that specify a chair by name are weaker than contracts that specify it by drawing. Drawings can be measured. Names cannot.

Terms worth fixing early

Deposits are schedule commitments on both sides. Once it clears, the sample date is fixed and the delivery window starts, so the sequence matters more than the percentage. Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature.

What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves. Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security. Quotations start from the Ember & Chair range.

How to check it on a sample

Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. The contract needs three attachments. One attachment leaves the other two open to argument. The drawing, the approved colour card and the packing list are the documents a dispute actually turns on, and the purchase order text is not one of them.

Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.

One more question

What should a specification include?

Frame species and section, foam density, cover reference and thickness, coating film, tolerance and packing. Six lines.

Holidays

Factory holiday schedule affects a project more than a shipping delay, because production stops and does not catch up.

Open

Peak season

Furniture production peaks in the weeks before the northern spring and autumn openings, when most dining areas are finishing.

Open

Corrected grain

Corrected grain leather has been sanded to remove defects and embossed with a pattern.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.