Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Chair price

The chair price is a range, and the range is the specification.

Price per steakhouse chair spans a factor of three between a powder coated steel frame with a PU seat and a solid beech frame with a full grain hide cover.

Spread
a factor of three by specification
Within a spec
about 20 percent
Compare at
same MOQ and packing

Quantity, sample and price

Within one specification the spread is about 20 percent, which is the gap between two workshops quoting the same drawing. The range is not a market inefficiency, it is the specification. The quote 40 percent below others is a different chair almost every time, and the difference appears in the foam density or the frame section.

Price per chair should be compared at the same MOQ and the same packing, because both move the landed cost.

The assumptions that fail

MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Quotations without a specification are numbers without a meaning. Two quotes for the same chair at different prices are usually two different chairs.

Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation. What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price.

Terms worth fixing early

Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature. Cost is decided at the drawing stage and only recorded at the invoice. By the time a quote looks expensive, the decisions that made it expensive are already fixed.

Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Currency matters on anything over sixty days. The quote in dollars against costs in renminbi moves three percent on a bad month, and the clause that reopens the price past that point protects both sides. Quotations start from the Ember & Chair range.

How to check it on a sample

Packing cost belongs in the unit price or in a separate line, never in neither. The quote that excludes cartons and pallets is ten percent cheaper on paper and level in the invoice. Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair.

Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.

One more question

Why is landed cost different from unit price?

Because freight, duty and packing sit on top. The chair that packs at 0.19 cubic metres costs less to land than one at 0.25, whatever the unit price says.

Verification

The order for 120 seats can pass through four hands before a saw is switched on: the one that sells.

Open

Audits

Furniture factory audit checks the workshop rather than the showroom: cutting, machining, upholstery.

Open

Base finish

Table base finish is powder coat, paint or bare metal, and it takes more contact than any other part of a table.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→