Furniture quotation breakdown runs to material, labour, coating, packing and margin.
Open15 July 2026
Furniture factory audit checks the workshop rather than the showroom: cutting, machining, upholstery, coating and packing, in that order.
The factory with no in-house coating sends frames out, which adds a week and removes control over the colour. The audit question is which processes happen under one roof. The audit that looks only at finished pieces tells you what the factory can buy in and not what it can make.
Ask to see the jigs, because a factory with jigs for a chair has made it before and one without is making it for the first time.
Sample cost is credited against the order, which means it is a commitment device instead of a charge. Buyers who never order pay for the workshop time. Buyers who do, do not. Capacity is a calendar.
Ask which week the line is booked. Monthly capacity is what the workshop can do, and the booking is when it will do yours.
The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. The calendar has two bottlenecks: sampling and coating. Cutting and assembly absorb change. The colour batch does not.
Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around. Cost is decided at the drawing stage and only recorded at the invoice. By the time a quote looks expensive, the decisions that made it expensive are already fixed.
What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves. Sampling takes seven to ten working days and the freight is usually on the buyer. Building the sample into the lead time at the quotation stage is what stops the first order arriving late. All 829 models are listed on the steakhouse furniture page.
Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Factory audits are worth a day when they look at three places: the cutting table, the upholstery bench and the packing area. The showroom says nothing that the packing area does not contradict.
Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.
No. The audit belongs on the first order, and the inspection belongs on every shipment.
Furniture quotation breakdown runs to material, labour, coating, packing and margin.
OpenFurniture payment terms are usually 30 percent with the order and 70 percent against shipping documents, which protects the buyer against non-delivery and the factory against cancellation.
OpenMortise-and-tenon joints cut 60 mm deep hold a 150 kg static load without a corner block.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.