Lead time
Furniture lead time of 25 to 35 days runs from the approved sample instead of from the payment.
Open14 August 2026
Furniture production peaks in the weeks before the northern spring and autumn openings, when most dining areas are finishing.
The factory at peak runs the same line with the same people and a longer queue. Booking a slot rather than a delivery date is what protects a schedule, because the queue is the variable. The delivery date given at peak is arithmetic on a production date that has already slipped. That is why the production date is the one to ask for.
Orders placed before a holiday period lose two to three weeks of effective production, and that belongs in the schedule instead of in an apology.
Sample cost is credited against the order, which means it is a commitment device instead of a charge. Buyers who never order pay for the workshop time. Buyers who do, do not. Capacity is a calendar.
Ask which week the line is booked. Monthly capacity is what the workshop can do, and the booking is when it will do yours.
Payment terms protect the buyer against delivery and the factory against cancellation. Thirty percent deposit and seventy on documents is the arrangement that keeps both sides interested. What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price.
Deposits are schedule commitments on both sides. Once it clears, the sample date is fixed and the delivery window starts, so the sequence matters more than the percentage. Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around.
Shipping schedules are not production schedules. The container that sails on the 14th has to be packed by the 10th, which means the last process has to finish by the 8th. Ask for the production date. Delivery dates are arithmetic on top of production dates and hide every delay inside them. All 829 models are listed on the steakhouse furniture page.
What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves. Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security.
The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. The workshop floor is described on our workshop.
Eight to ten weeks before an opening date, which allows for sampling, production and shipping with a week of slack.
Furniture lead time of 25 to 35 days runs from the approved sample instead of from the payment.
OpenFurniture volume discount is not linear, because the cost structure changes with quantity.
OpenRemoving chewing gum from a cover works by freezing it with an ice cube or a aerosol, then lifting it off in one piece.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp