Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Spares

Two covers and a set of glides cover most of a year.

Furniture spare parts should be ordered with the furniture, because the parts match the batch and the batch runs out.

Order with
the furniture
Include
glides, covers, hardware
Cost
a few percent of the order

How a quotation is built

The set of glides, two covers and a hardware kit cost a few percent of the order and remove most of the reasons a dining area calls the factory in the first year. Glides wear faster than anything else and are the cheapest part. That is why they are the part most often forgotten. The cover ordered later will not match, so the spares have to come from the same cut as the order.

MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Lead time runs 25 to 35 days from the approved sample. The seven to ten days inside that is sampling, and it is the part that gets forgotten in a schedule.

What gets renegotiated

Third party inspection is worth the fee on a first order and rarely worth it on a repeat. The first order is where the assumptions differ. The repeat is where they have already been tested. Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation.

Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.

What to put in the contract

What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price. Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature.

Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around. Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Our steakhouse furniture covers every model, size and finish.

Where the money goes

Warranty of two years on frames and one year on covers is a normal split, and the split matters more than the length. Failures at the joint are a frame matter. Failures at the seam are a cover matter. Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair.

Reorders should reuse the drawing, the colour card and the packing list from the first order. Starting a reorder from a conversation is how the second batch comes back 40 mm narrower than the first. The workshop floor is described on our workshop.

One more question

How many spares are enough?

One set of glides per 10 seats and two covers per dining area. That covers what fails in the first year.

Reorders

Reorder colour matching fails across three materials at once: hide, powder coat and stain.

Open

Changes

Order changes are free in principle and expensive in practice once cutting starts.

Open

The window

Freight damage lives inside a window set by the carrier.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→