Insurance
Furniture shipping insurance claims fail on the baseline instead of on the loss.
Open19 September 2026
Order changes are free in principle and expensive in practice once cutting starts.
The window closes about 48 hours before the first cut, because material has been allocated and the cutting list has been set. After that a change costs the material that has been cut plus the labour already spent on it. The change to the cover is more expensive than a change to the quantity, because the hide is cut first and the cover is the longest lead item.
Changes that arrive as a conversation instead of a written instruction get implemented partly, which is how a dining area ends up with two versions of one chair.
MOQ exists because cutting lists round up. Thirty seats is where a hide, a plywood sheet and a powder coat batch all stop being waste. Third party inspection is worth the fee on a first order and rarely worth it on a repeat. The first order is where the assumptions differ. The repeat is where they have already been tested.
The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature.
The calendar has two bottlenecks: sampling and coating. Cutting and assembly absorb change. The colour batch does not. Insurance and title transfer are commercial terms that get ignored until a container is lost.
Agree them before the first shipment. Agreeing them afterwards means a re-make.
Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security. The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. Every model sits inside the steakhouse range.
Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair.
Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Reorders should reuse the drawing, the colour card and the packing list from the first order. Starting a reorder from a conversation is how the second batch comes back 40 mm narrower than the first. The workshop floor is described on our workshop.
The written instruction with a date, a cost and a signature. Anything else is a request instead of a change.
Furniture shipping insurance claims fail on the baseline instead of on the loss.
OpenIncoterms for furniture are usually EXW, FOB or DDP, and the choice decides who carries risk at which point.
OpenPowder coat at 60 to 80 microns survives a service trolley and a chair dragged across a tiled floor.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp