Inspection
Third party inspection on furniture costs a few hundred pounds per shipment and checks a sample of pieces against the approved sample.
Open25 October 2026
Product liability for furniture sits with the party that placed the piece on the market, which is usually the seller rather than the factory.
That is a commercial fact instead of a legal opinion, and it is why a specification in writing matters: it moves the question from what the buyer expected to what was agreed. The specification that states a load rating and a use gives both sides a reference point when something fails. Modifying a piece after delivery transfers part of the liability to whoever modified it, which is worth knowing before a dining area is drilled on site.
Payment terms protect the buyer against delivery and the factory against cancellation. Thirty percent deposit and seventy on documents is the arrangement that keeps both sides interested. Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation.
Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.
The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. Deposits are schedule commitments on both sides. Once it clears, the sample date is fixed and the delivery window starts, so the sequence matters more than the percentage.
Orders placed before a national holiday lose two to three weeks of effective production, and that has to be in the schedule instead of in an apology. Documents that protect both sides are short: a drawing, a specification, a sample reference, a schedule and a change procedure. Anything longer is usually unread.
The factory that answers questions in writing is easier to work with than one that answers on a call. Written answers survive staff changes on both sides. Currency matters on anything over sixty days. The quote in dollars against costs in renminbi moves three percent on a bad month, and the clause that reopens the price past that point protects both sides. Quotations start from the Ember & Chair range.
Step pricing should be quoted as three lines from the start: thirty seats, one hundred, three hundred. The buyer who learns the third price after committing to the first feels misled even when nothing was hidden. Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair.
Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. The workshop floor is described on our workshop.
It defines the commercial remedy and does not change the underlying question. Both documents should exist.
Third party inspection on furniture costs a few hundred pounds per shipment and checks a sample of pieces against the approved sample.
OpenFurniture quality claims settle on evidence, and evidence is three things: the model code.
OpenLacquer and oil finishes fail differently on a steakhouse table.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.