Payment terms
Furniture payment terms are usually 30 percent with the order and 70 percent against shipping documents, which protects the buyer against non-delivery and the factory against cancellation.
Open9 July 2026
Furniture quotation breakdown runs to material, labour, coating, packing and margin, and a quote that shows only a total cannot be compared with another.
Two quotes for the same chair at different prices are usually two different chairs, and the difference is in the cover, the frame section or the foam density. The cover is the line that moves most between quotes, because hide and PU differ by a factor of two at the same visual appearance. Packing is the line most often left out and the one that appears as a surprise charge at shipping.
Prices move with hide and steel, which are both commodities. The quote held for six months is a quote that will be renegotiated, so fixing validity is part of the negotiation.
Volume discount is not linear. The first thirty seats carry the setup. The next three hundred carry material and labour. Expecting the same percentage on both is a misunderstanding of where cost sits.
The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. What gets renegotiated is almost always the cover. Hide prices move faster than anything else in the quote, and a cover substitution is the easiest way for a factory to hold a price.
Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature. What changes mid-order is usually the cover or the quantity. Both ripple through material ordering, and both have a point past which the change costs more than it saves.
Quotations carry a validity date for a reason. Thirty days is normal and hide moves weekly, so a quote accepted in month three is a quote that gets renegotiated or quietly downgraded in the cover. Mixed containers have two MOQs, one per model and one per cover. Ten of four models in the same hide is a normal order. Ten of four models in four different hides is four small orders. Sizes, finishes and lead times are set out across steakhouse seating.
Change control starts at cutting. Anything changed after the hide is cut costs the material as well as the labour, and that is a clause worth reading before the first amendment. Packing cost belongs in the unit price or in a separate line, never in neither. The quote that excludes cartons and pallets is ten percent cheaper on paper and level in the invoice.
Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. Cost is built from five lines: material, labour, coating, packing and inland freight. The quote with one number and no breakdown cannot be compared with any other quote, which is usually the point of quoting it that way. The workshop floor is described on our workshop.
Ask for the specification instead of the breakdown, because the specification is what can be checked. The breakdown is useful for negotiating and a specification is useful for buying.
Furniture payment terms are usually 30 percent with the order and 70 percent against shipping documents, which protects the buyer against non-delivery and the factory against cancellation.
OpenFurniture sample cost runs 1.5 to 2 times the production price of the piece.
OpenWall anchoring for fixed seating uses fixings through the back into studs at 400 mm centres.
OpenMOQ, samples, quotations, payment, audits and what a factory can actually promise.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.