Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Claims

The claim needs the model, the carton and a photograph.

Furniture quality claims settle on evidence, and evidence is three things: the model code, the carton number and a photograph in focus.

Evidence
model, carton, photograph
Raised
before installation
Settlement
parts

Cost and commitment

The claim without those becomes a conversation about what might have happened. The first hour on site is when the evidence exists. Claims raised after installation have to show a manufacturing fault instead of an installation one. That is why the pre-install photographs matter.

Settlement is usually parts instead of whole units, which is worth knowing before the argument starts.

What changes mid-order

Quotations without a specification are numbers without a meaning. Two quotes for the same chair at different prices are usually two different chairs. Third party inspection is worth the fee on a first order and rarely worth it on a repeat. The first order is where the assumptions differ. The repeat is where they have already been tested.

The quotation is built from material, labour, coating, packing and margin. Knowing which line is thin tells a buyer where to negotiate and where not to bother. Written change control is the difference between a variation and an argument. Every change after cutting should have a date, a cost and a signature.

The paperwork that protects both sides

Orders placed before a national holiday lose two to three weeks of effective production, and that has to be in the schedule instead of in an apology. Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around.

Insurance and title transfer are commercial terms that get ignored until a container is lost. Agree them before the first shipment. Agreeing them afterwards means a re-make. The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. All 829 models are listed on the steakhouse furniture page.

What to ask the factory

Factory audits are worth a day when they look at three places: the cutting table, the upholstery bench and the packing area. The showroom says nothing that the packing area does not contradict. Step pricing should be quoted as three lines from the start: thirty seats, one hundred, three hundred. The buyer who learns the third price after committing to the first feels misled even when nothing was hidden.

Ask for the packing list and three photographs a week before the vessel sails. At that point a missing model can still be made. After the container is closed it is a claim. Reorders should reuse the drawing, the colour card and the packing list from the first order. Starting a reorder from a conversation is how the second batch comes back 40 mm narrower than the first. The workshop floor is described on our workshop.

One more question

How fast should a claim be raised?

Within 72 hours of unpacking, while the cartons and the packing list are still together.

Warranty

Furniture warranty terms usually cover frame structure for five years and covers for one.

Open

Spares

Furniture spare parts should be ordered with the furniture, because the parts match the batch and the batch runs out.

Open

Refusals

Claims refused after installation are usually refused on causation instead of on damage.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→