Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Samples

The sample costs the freight. The unit price is credited against the order.

Furniture sample cost runs 1.5 to 2 times the production price of the piece, and it is credited against the order when one follows.

Cost
1.5 to 2 times production
Credited
against the order
Lead time
7 to 10 working days

Quantity, sample and price

The multiple covers the workshop time that a production run amortises. The buyer who never orders pays for that time, and a buyer who does, does not. Sample cost credited against the order is a standard arrangement and worth confirming in writing, because it is not universal.

The sample made by hand and a production piece made on a jig are not the same object. That is why the sample should be approved against the production method.

The assumptions that fail

Sample cost is credited against the order, which means it is a commitment device rather than a charge. Buyers who never order pay for the workshop time. Buyers who do, do not. Lead time runs 25 to 35 days from the approved sample. The seven to ten days inside that is sampling, and it is the part that gets forgotten in a schedule.

Payment terms protect the buyer against delivery and the factory against cancellation. Thirty percent deposit and seventy on documents is the arrangement that keeps both sides interested. Tooling is a one-off that belongs to the buyer only if the buyer pays for it. Confirm ownership in writing or expect to pay again on a repeat order.

Terms worth fixing early

Reorders are faster than first orders because the sample, the drawing and the coating colour already exist. That is a real advantage and worth planning around. Cost is decided at the drawing stage and only recorded at the invoice. By the time a quote looks expensive, the decisions that made it expensive are already fixed.

Payment terms follow the schedule. Thirty percent on order and the balance against the bill of lading copy is standard. The balance paid before production starts is a loan to the factory with no security. The production clock starts at the approved sample and the cleared deposit, whichever is later. The order that clears on a Friday and approves the sample three weeks later is three weeks behind before a saw is switched on. Quotations start from the Ember & Chair range.

How to check it on a sample

Sampling takes seven to ten working days and the freight is usually on the buyer. Building the sample into the lead time at the quotation stage is what stops the first order arriving late. Step pricing should be quoted as three lines from the start: thirty seats, one hundred, three hundred. The buyer who learns the third price after committing to the first feels misled even when nothing was hidden.

Drawings go back to the factory with comments within forty eight hours or they are approved by default. That deadline is worth writing down, because the chair built to a drawing nobody read is still a chair. Production should use the same material as the sample. The sample cut from a stock hide and the order cut from a new lot are two colours, and the difference arrives at the door. The workshop floor is described on our workshop.

One more question

Is a sample always necessary?

On a first order with a new cover, yes. On a repeat of an existing line, no, and paying for one twice is a waste.

MOQ

The minimum order quantity on upholstered seating is 30 pieces per line.

Open

Second orders

Second order planning is different from the first, because the object is defined and the only variables are quantity, colour and date.

Open

Booth entry

Booth entry width is the clear gap between the end of a run and the next fixed object.

Open

Sourcing and terms

MOQ, samples, quotations, payment, audits and what a factory can actually promise.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→