Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Inspection and claims

Inspection and claims, in 25 notes.

What to open first, how to photograph it and what a factory will accept.

Articles
25
Newest
16 November 2026
Oldest
25 June 2026
  • The fileThe claim file holds the order, the packing list, the delivery note, the inspection report, the photographs and the correspondence, in that order.
  • The signatureThe delivery note signature is a statement about condition, and signing it clean is a statement that the cartons were sound.
  • Pre-shipmentPre-shipment inspection findings are the only claims that cost nothing, because the piece never leaves the factory.
  • Two clocksWarranty and transit damage are separate promises with separate clocks.
  • Return costReturn freight on a single chair by sea is close to the price of the chair, and by air it is more.
  • The formThe inspection report is one page per carton with five fields: carton number, model, quantity, condition and photographs taken.
  • The sampleThe retained sample is the approved piece kept from the order, and it is what every later comparison is measured against.
  • SettlementCredit note or replacement is a decision about the dining area rather than about the money.
  • PartsReplacement part requests need the model code, the carton number and the delivery date, and without all three the factory cannot match the batch.
  • LiabilityCarrier liability covers what happened between the loading dock and the door, and it is limited by weight instead of by value.
  • The labelThe carton label carries the model, the quantity, the carton number and often the batch, which is what lets a factory match a fault to a run.
  • Before fixingThe pre-installation record is six frames per piece: the carton label, the piece on all four sides, the underside and any fault.
  • RefusalsClaims refused after installation are usually refused on causation instead of on damage.
  • The clauseThe claim window is set by the contract and shortened by use.
  • ConcealedConcealed damage is damage a carton does not show, and it needs the carton kept as evidence instead of flattened.
  • The windowFreight damage lives inside a window set by the carrier, and the window is measured from delivery instead of from opening.
  • HardwareMissing hardware is a packing claim, proved by the carton instead of by the dining area.
  • ToleranceDimension disputes are settled by the tolerance written on the drawing. The tape measure on site measures the wall, and the wall was never the contract.
  • Lot driftHide dye lot variation is a property of the material instead of a defect.
  • Colour claimColour mismatch needs a physical sample and a lot number, because photographs of two covers taken under different light prove nothing.
  • Wrong modelConfirm the wrong model from the code on the carton label, the code on the piece and the code on the order, read in that order.
  • Short shipmentShort shipment rests on three documents: the packing list, the delivery note and the count taken at the door.
  • EvidencePhotographing damage for a claim means four frames per fault: the carton label, the fault in the carton, the fault close up with a scale, and the piece in the dining area.
  • The countCounting cartons against the packing list is a door job, done while the driver is still there.
  • First hourThe first hour on site is a carton count against the packing list, a walk of the dining area with the delivery note in hand, and three cartons opened in front of a camera.

Contact

Layout and quote in two working days.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→