First hour
The first hour on site is a carton count against the packing list, a walk of the dining area with the delivery note in hand, and three cartons opened in front of a camera.
Open1 July 2026
Counting cartons against the packing list is a door job, done while the driver is still there.
The number on the list, the number on the truck and the number signed for have to match before the cartons move. Once they are stacked in a back dining area, a missing carton is a conversation rather than a fact. Shorthand on a delivery note such as unexamined or subject to count keeps the claim open without holding up the driver.
Carton numbers carry the model and the sequence, so a missing number points to what was inside it without opening anything.
Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's. Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked.
Claims fail on evidence. The fair complaint with no photographs goes nowhere. Photographs with no date, no carton number and no model code are stories instead of claims. The claim window is set by the contract and shortened by use. Anything found after installation has to be shown to be a manufacturing fault instead of an installation one.
Missing hardware is a packing claim, and it is settled with a courier. Photograph the carton label and the contents together. The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later.
Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation. Trial assembly of one run before installing all of them catches specification errors while they are still cheap. Sizes, finishes and lead times are set out across steakhouse seating.
Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim. Unpacking and checking should be one job done once, by one person, with a camera. Split between people it produces gaps.
The response deadline belongs in the contract. The email thread is not a record anyone can be held to. Fourteen days to answer a claim and thirty to settle is a clause that keeps a file moving without anybody chasing. Claim letters work when they carry facts and no adjectives. The paragraph that describes what was seen and what is expected gets an answer. The paragraph about disappointment gets forwarded. Bench lengths and depths sit under steakhouse bench seating.
No. The list says what should be there, and only the truck says what is. The gap between the two is the claim.
The first hour on site is a carton count against the packing list, a walk of the dining area with the delivery note in hand, and three cartons opened in front of a camera.
OpenThe claim file holds the order, the packing list, the delivery note, the inspection report.
OpenPort to door delivery adds about seven days to a transit and introduces the last mile.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp