Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/The sample

The sample in the cupboard is the only witness a claim has.

The retained sample is the approved piece kept from the order, and it is what every later comparison is measured against.

Keep
one piece per order
Store
dark, dry, off the floor
Settles
colour, sheen, stitch, foam

Inspection order

Colour, sheen, stitch density and foam feel all drift in description, and none of them drift in a sample. Keeping one piece per order, labelled and dry, costs a chair and settles arguments for years. Keep the sample in the dark and off the floor, because light shifts a finish and damp shifts a frame.

The sample is also the reference for the second order, which is where colour drift usually arrives.

Why claims stall

Colour mismatch claims need a physical sample and the lot number. Photographs of two covers under different lighting prove nothing on their own. Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation.

Inspection order matters: cartons, then count, then three opened, then dimensions, then finish, then assembly. Each step closes a question the next step depends on. Claims stall when the factory cannot reproduce the problem. Photographs of the actual joint or seam, in focus, resolve in a day what a description cannot resolve in a week.

What the file needs

Settlement is usually parts. Replacing a whole booth for one torn cover is rare. Knowing that in advance sets expectations and shortens the argument. The disputes that repeat are colour, dimension and damage timing. All three are settled by a sample kept from the approved batch.

Keep one carton unopened until the end of the install. It is the reference for everything that was in the shipment. Claims read best as one page and three tables. What was ordered, what arrived, what is wrong, with carton numbers in the first column, settles more than three pages of narrative. Every model sits inside the steakhouse range.

What the sample should prove

Damage rates are worth tracking per container. The order average hides the one bad carton. The line that sits at two percent for a year and jumps to nine percent is telling you about a packer. Luck moves a price by a point or two.

Claims reviewed once a year show patterns nobody sees in a single file. The three faults that recur turn into a specification change, which is cheaper than settling them annually.

Photograph metadata is evidence and chat compression removes it. The original files kept on the phone are dated. The same picture sent through an app arrives without a timestamp. The contract should name the inspection standard. Two pages that describe how a frame is checked turn a dispute about opinion into a check against a list. Runs are set out under hearth benches.

One more question

Who should hold the sample?

The site that placed the order. The factory cannot see the wall. The sample held by the factory is a sample handled by the party being measured.

Settlement

Credit note or replacement is a decision about the dining area rather than about the money.

Open

Parts

Replacement part requests need the model code, the carton number and the delivery date.

Open

Touch-up

Touch-up on site covers chips in a coating, scuffs on a cover and marks on a timber edge.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→