Before fixing
The pre-installation record is six frames per piece: the carton label, the piece on all four sides.
Open17 September 2026
The carton label carries the model, the quantity, the carton number and often the batch, which is what lets a factory match a fault to a run.
The claim without the label is a claim about one chair. The claim with it is a claim about the run that chair came from. Photograph the label before the carton is opened. Afterwards nobody can prove which carton the piece came from.
Batch on the label is what turns one cracked frame into a check of every frame from that week. Labels are printed at packing and stuck by hand, so a label on the wrong carton is itself a packing error worth reporting.
Claims fail on evidence. The fair complaint with no photographs goes nowhere. Photographs with no date, no carton number and no model code are stories rather than claims. The claim window is set by the contract and shortened by use. Anything found after installation has to be shown to be a manufacturing fault instead of an installation one.
Missing hardware is a packing claim, and it is settled with a courier. Photograph the carton label and the contents together. Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation.
Claims stall when the factory cannot reproduce the problem. Photographs of the actual joint or seam, in focus, resolve in a day what a description cannot resolve in a week. Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim.
The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders. Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. Quotations start from the Ember & Chair range.
Claims read best as one page and three tables. What was ordered, what arrived, what is wrong, with carton numbers in the first column, settles more than three pages of narrative. Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which.
Packing faults have to be proved with the carton. The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing. Photograph metadata is evidence and chat compression removes it. The original files kept on the phone are dated. The same picture sent through an app arrives without a timestamp. Every timber bench is listed under solid timber benches.
Then the carton number on the delivery note is the next best link, and the claim is weaker for it. Note the missing label in the file as its own fault.
The pre-installation record is six frames per piece: the carton label, the piece on all four sides.
OpenClaims refused after installation are usually refused on causation instead of on damage.
OpenCounter stool foot rings take load in hoop tension, so removing one lets the legs splay outwards under the same weight.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp