Hardware
Missing hardware is a packing claim, proved by the carton instead of by the dining area.
Open18 August 2026
Freight damage lives inside a window set by the carrier, and the window is measured from delivery rather than from opening.
Fifteen days is common for concealed damage and three days for visible damage, and the delivery note signature decides which one applies. Reading the carrier terms before the truck arrives is the whole of the preparation. Signing clean when the carton is crushed closes the visible damage route and leaves only the slower concealed one.
Photographs of the carton before it is opened are the only record of the condition the carrier handed over.
Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's. Claims fail on evidence. The fair complaint with no photographs goes nowhere. Photographs with no date, no carton number and no model code are stories instead of claims.
The claim window is set by the contract and shortened by use. Anything found after installation has to be shown to be a manufacturing fault instead of an installation one. The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later.
Record what was installed where. The claim about the fourth booth is stronger when the file says which carton it came from. Signing acceptance at handover keeps rights on latent defects. What it does fix is the record of what was visible on the day.
Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. Insurance and factory claims run on different clocks and different evidence. The insurance claim needs the loading photographs and the survey. The factory claim needs the carton and the count.
Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable. Quotations start from the Ember & Chair range.
Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which. Spare parts shipped ahead solve most claims faster than a settlement.
The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not.
The claim closed in four days costs less over five years than one with a clean record and a slow argument. What a file looks like before the claim matters less than how fast it closes after. Runs are set out under hearth benches.
It ends the visible damage route. Concealed damage is still claimable inside its own window, with the carton photographs as the evidence.
Missing hardware is a packing claim, proved by the carton instead of by the dining area.
OpenDimension disputes are settled by the tolerance written on the drawing. The tape measure on site measures the wall, and the wall was never the contract.
OpenRust prevention on steel furniture comes down to the coating and the drainage. The steel grade does less than buyers expect.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.
Own workshop · EXW Foshan or DDP
Send the plan and the seat count. Answer inside two working days.
Chat on WhatsApp