Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/The clause

The claim window is in the contract. The conversation has no dates in it.

The claim window is set by the contract and shortened by use.

Visible faults
30 days is common
Structural
12 months is common
Use
closes the transit part

Counting and checking

Thirty days from delivery for visible faults and twelve months for structural ones is a common split, and installation usually ends the transit part of it. Reading that clause before the first carton is opened is worth more than any amount of photographing afterwards. Use is the clause that closes windows early, and a chair bolted to the floor counts as used from the day it is bolted.

Windows that have closed can still be reopened by showing a manufacturing fault. That is why the piece is kept rather than scrapped.

The claims that get refused

Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's. Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked.

The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later. Record what was installed where. The claim about the fourth booth is stronger when the file says which carton it came from.

What to photograph

Replacement parts need the model code, the carton and the date. Without all three the factory cannot match the batch, and a mismatched part is a second claim. The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders.

Four photographs per fault is the minimum: the label, the fault in place, the fault close up with a scale, and the dining area. The claim that arrives with twelve photographs of one corner and none of the label stalls for a week. The response deadline belongs in the contract. The email thread is not a record anyone can be held to. Fourteen days to answer a claim and thirty to settle is a clause that keeps a file moving without anybody chasing.

Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable. Sizes, finishes and lead times are set out across steakhouse seating.

How to check it on a sample

Packing faults have to be proved with the carton. The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing.

Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not.

The claim closed in four days costs less over five years than one with a clean record and a slow argument. What a file looks like before the claim matters less than how fast it closes after. Every timber bench is listed under solid timber benches.

One more question

What counts as use?

Installation, and sometimes assembly. The piece unpacked and left in its carton is not used. The piece fixed to the floor is.

Concealed

Concealed damage is damage a carton does not show, and it needs the carton kept as evidence instead of flattened.

Open

The window

Freight damage lives inside a window set by the carrier.

Open

Microfibre

Microfiber seating uses a fine synthetic fibre with a suede-like surface.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→