Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/The file

The claim file is kept for two years, or it is not a file.

The claim file holds the order, the packing list, the delivery note, the inspection report, the photographs and the correspondence, in that order.

Holds
order to correspondence
Kept
two years
Filed by
sequencing

Unpacking and checking

Kept for two years it covers the warranty period and the second order that follows it. Kept for a month it covers the argument that was happening at the time. Keep the file against the order rather than against the fault, because the second fault usually arrives on the same order.

Two years is the practical number. The contract may ask for longer and the hide may ask for shorter.

The disputes that repeat

Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked. Inspection order matters: cartons, then count, then three opened, then dimensions, then finish, then assembly. Each step closes a question the next step depends on.

Natural variation in hide and timber is not a defect. The specification should say so, so that the conversation is about tolerance instead of about taste. Settlement is usually parts. Replacing a whole booth for one torn cover is rare. Knowing that in advance sets expectations and shortens the argument.

What to send the factory

The disputes that repeat are colour, dimension and damage timing. All three are settled by a sample kept from the approved batch. Keep one carton unopened until the end of the install. It is the reference for everything that was in the shipment.

Send the factory a short list with photographs and carton numbers. Long emails with a general complaint get a general answer. The response deadline belongs in the contract. The email thread is not a record anyone can be held to. Fourteen days to answer a claim and thirty to settle is a clause that keeps a file moving without anybody chasing. Quotations start from the Ember & Chair range.

What to ask the factory

Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not. Claim letters work when they carry facts and no adjectives.

The paragraph that describes what was seen and what is expected gets an answer. The paragraph about disappointment gets forwarded.

Photograph metadata is evidence and chat compression removes it. The original files kept on the phone are dated. The same picture sent through an app arrives without a timestamp. The contract should name the inspection standard. Two pages that describe how a frame is checked turn a dispute about opinion into a check against a list. Runs are set out under hearth benches.

One more question

Paper or digital?

Digital, backed up, and named by order. Paper files go missing in a site office, and a site office is where a claim is usually raised.

The signature

The delivery note signature is a statement about condition.

Open

Pre-shipment

Pre-shipment inspection findings are the only claims that cost nothing, because the piece never leaves the factory.

Open

Budget

Furniture replacement budget works best as a percentage: about 10 percent of a dining area a year.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→