The form
The inspection report is one page per carton with five fields: carton number, model, quantity.
Open23 October 2026
Return freight on a single chair by sea is close to the price of the chair, and by air it is more.
That arithmetic is why most claims settle as credit, as a local repair or as a part rather than as a return. Asking for the return cost before agreeing to it turns a principle into a number. Returns also carry the import paperwork in reverse, which costs more in time than the freight costs in money.
Scrapping a faulty piece locally and shipping a replacement is often cheaper than moving the faulty one, and it needs the agreement in writing.
Short shipment and wrong model are the two claims that are easiest to prove and most often raised late. Both should be caught in the first hour. Colour mismatch claims need a physical sample and the lot number. Photographs of two covers under different lighting prove nothing on their own.
The claims that get refused are the ones raised after installation without a pre-install photograph. That single image decides most of them. Trial assembly of one run before installing all of them catches specification errors while they are still cheap.
Natural variation in hide and timber is not a defect. The specification should say so, so that the conversation is about tolerance instead of about taste. The response deadline belongs in the contract. The email thread is not a record anyone can be held to. Fourteen days to answer a claim and thirty to settle is a clause that keeps a file moving without anybody chasing.
Third party inspection reports carry weight because they are written by someone with nothing to sell. The same findings in a buyer's email are a position instead of a finding. Repair and compensation are two settlements and the cheaper one is often better. The cover replaced locally at 40 dollars settles a claim that would cost 200 in freight to return.
Rejecting a whole container is the most expensive claim available. It costs the freight both ways, the duty and the opening date. That is why it is reserved for faults that make the goods unsellable. Our steakhouse furniture covers every model, size and finish.
Wrong items are cheaper to fix than to argue. Sending the right part and crediting the freight costs less than the exchange of letters that establishes whose mistake it was. Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not.
Claims reviewed once a year show patterns nobody sees in a single file. The three faults that recur turn into a specification change, which is cheaper than settling them annually. Every timber bench is listed under solid timber benches.
The factory, in principle. In practice a credit is offered instead, because the freight costs more than the credit is worth.
The inspection report is one page per carton with five fields: carton number, model, quantity.
OpenThe retained sample is the approved piece kept from the order.
OpenAssembly jigs drift by about 1 mm over a production run.
OpenWhat to open first, how to photograph it and what a factory will accept.
OpenDimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.