Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/First hour

The first hour on site is a carton count. Nothing is opened before it.

The first hour on site is a carton count against the packing list, a walk of the dining area with the delivery note in hand, and three cartons opened in front of a camera.

When
first hour, before anything moves
Measured against
packing list and delivery note
Recorded
carton labels, contents, damage

What to open first

Anything found after installation has to be argued as a manufacturing fault instead of a transit one, and that argument is harder to win. Thirty minutes of counting protects the rest of the claim window. Counting after the cartons have been moved cannot be tied to the delivery note, and the note is the only record the carrier signed.

Three cartons opened and photographed in the first hour set the standard for the other sixty, because damage to those three is proved instead of described. The walk matters as much as the count. Cartons stacked against a wall hide the one face that took the impact.

Where claims fail

Open three cartons. Thirty is checking, and three is sampling. The first three tell you whether the batch is right. The rest tell you the same thing more slowly.

Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's.

Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked. The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later.

What evidence works

Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation. Inspection order matters: cartons, then count, then three opened, then dimensions, then finish, then assembly. Each step closes a question the next step depends on.

The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders. Insurance and factory claims run on different clocks and different evidence. The insurance claim needs the loading photographs and the survey. The factory claim needs the carton and the count. Our steakhouse furniture covers every model, size and finish.

What it costs at year five

Responsibility divides at three points: the factory door, the vessel and the site. Damage that shows at the door is packing. Damage that shows after unloading is handling, and the photographs decide which. Packing faults have to be proved with the carton.

The photograph of the chair shows damage, and a photograph of the carton shows why. The carton with 10 mm of foam around a 25 kg top explains the damage. The same carton thrown away explains nothing.

Wet damage is proved by a moisture reading. The meter reading of 18 percent against a dispatch reading of 10 percent proves condensation in transit, and a mark on the surface proves nothing. The claim closed in four days costs less over five years than one with a clean record and a slow argument. What a file looks like before the claim matters less than how fast it closes after. Runs are set out under hearth benches.

One more question

What if the truck arrives after the kitchen closes?

Count and photograph the stack at the door, then leave the opening until the morning. The stack as delivered is the part that cannot be recreated later.

The file

The claim file holds the order, the packing list, the delivery note, the inspection report.

Open

The signature

The delivery note signature is a statement about condition.

Open

Claims

Furniture quality claims settle on evidence, and evidence is three things: the model code.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→