Ember & Chair Steakhouse seating · Foshan, China WhatsApp
Send the floor plan and the seat count. Layout and quote back in two working days. Talk to us →
Steakhouse furniture Ember & ChairSteakhouse seating 829 models Design
Home/Blog/Short shipment

Short shipment is the easiest claim to prove and the one raised latest.

Short shipment rests on three documents: the packing list, the delivery note and the count taken at the door.

Proves it
list, note and door count
Counted in
cartons first
Raise within
the delivery week

Inspection order

When the three agree on what was shipped and disagree with what arrived, the claim settles in days. When the count happened three weeks later, the same claim becomes a negotiation about who misplaced a carton. Shortage is counted in cartons before it is counted in chairs, because a carton is what the list and the carrier both track.

One carton short on a forty carton delivery is usually a loading error rather than a loss, and a photograph of the load finds it faster than an argument.

Why claims stall

Photograph the carton before opening it. Damage that happened in transit looks different from damage that happened at unpacking, and only one of them is the factory's. Count against the packing list at the dock, before anything moves. Counts done after the goods are distributed cannot be checked.

Missing hardware is a packing claim, and it is settled with a courier. Photograph the carton label and the contents together. The first hour on site should be a count and a walk. Count cartons, open three, photograph what is inside, and note anything that will need a claim later.

What the file needs

Gaps in the evidence appear later. Missing carton labels or a discarded packing list turn a clear claim into a negotiation. Record what was installed where. The claim about the fourth booth is stronger when the file says which carton it came from.

The container number belongs on every photograph and every email. Six months later it is the only thing that ties a damaged chair to a shipment, because carton numbers repeat across orders. Claims read best as one page and three tables. What was ordered, what arrived, what is wrong, with carton numbers in the first column, settles more than three pages of narrative. Every model sits inside the steakhouse range.

What the sample should prove

Insurance and factory claims run on different clocks and different evidence. The insurance claim needs the loading photographs and the survey. The factory claim needs the carton and the count. Third party inspection reports carry weight because they are written by someone with nothing to sell. The same findings in a buyer's email are a position instead of a finding.

Spare parts shipped ahead solve most claims faster than a settlement. The hinge that arrives in four days closes the issue. The credit note that arrives in six weeks does not. The claim closed in four days costs less over five years than one with a clean record and a slow argument. What a file looks like before the claim matters less than how fast it closes after. Runs are set out under hearth benches.

One more question

What if the missing carton turns up later?

The claim closes and the carton is added to the file with its arrival date. Nothing is lost by claiming early, and a claim raised late cannot be closed the same way.

Evidence

Photographing damage for a claim means four frames per fault: the carton label, the fault in the carton, the fault close up with a scale, and the piece in the dining area.

Open

The count

Counting cartons against the packing list is a door job, done while the driver is still there.

Open

Validity

Furniture quote validity is usually 30 to 60 days, because hide and steel are commodities and both move.

Open

Send the floor plan. Get the layout and the quote.

Dimensions, seat count and the finish you have in mind are enough to start. What comes back is a quantity per line, a leather card, a sample date and a loading window. All of it fits on one page.

Own workshop · EXW Foshan or DDP

Design referencesFourteen positions, measured→ Buying guidesEight decisions, with the numbers→ BlogThree hundred notes, two a day→ Project filesThree projects, and what changed→ The spec sheetNine numbers and the tolerance→ Talk about your steakhouseSend the plan, get a seat count→